My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
TETRA TECH
Clerk
>
Contracts / Agreements
>
T
>
TETRA TECH
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/25/2020 12:48:26 PM
Creation date
10/8/2018 4:33:28 PM
Metadata
Fields
Template:
Contracts
Company Name
TETRA TECH
Contract #
A-2018-224
Agency
Public Works
Council Approval Date
9/18/2018
Expiration Date
10/1/2020
Insurance Exp Date
10/1/2020
Destruction Year
2026
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
74
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Santa Ana <br />for constructabillty and interdisciplinary issues. <br />The final phase is a peer review to produce an <br />Independent quality check prior to submittal. This <br />process fixes mistakes, verifies compliance with <br />design criteria and codes, and provides feedback <br />to the design team. Furthermore, the process Is <br />audited to keep the managers accountable for <br />following the quality check process <br />RELEVANT PROJECT EXPERIENCE <br />We believe that our best reference of our experience is our past performance on these featured projects <br />that we have completed for the City. We are confident that these past projects will attest to our technical <br />excellence, responsive staff and our complete understanding of projects of this nature. We are committed to <br />providing the same quality service that we provided on our previous projects. <br />The table below highlights key and relevant aspects of our previous projects , <br />Active Transportation Projects (ATP) 2 and W <br />City. of Los Angeles, Bureau of Engineering }' <br />Shell Beach Road Streetscape Phase I <br />C, x „ JM% z t; <br />Project <br />xea r� v, r <br />S' <br />City of Pismo Beach <br />_ .. <br />�ry�" ,�"1g r r; <br />Sixth Street Viaduct PARC Proojectx <br />City of Los Angeles, Bureau of Engineering <br />Soto Street Bridge Over Mission Road and <br />Huntington Drive Bridge Removal and Street <br />Improvement Project" <br />City of Los Angeles, Bureau of Engineering <br />Taylor Yard BlkewaytPedestrlan Bridge <br />City of Los Angeles, Architectural Division <br />Templeton to Atascadero Connector Trail" <br />County of San Luis Obispo, General Services Agency <br />* Denotes a project that is featured within this proposal, <br />14 nCSIGN SERVICES RFP NO,: 18-042 <br />
The URL can be used to link to this page
Your browser does not support the video tag.