Laserfiche WebLink
Lincoln Avenue Pedestrian Pathway Connectivity I Park Lane to Santiago crack <br />meets or exceeds the expectations of the City <br />and the community, but will accomplish this within <br />the allocated construction budget, To meet this <br />requirement, the Tetra Tech team will maintain a <br />running cost estimate of the overall project, provide <br />value engineering recommendations, and will <br />coordinate work closely with Mr. Jason Fussell, the <br />Tetra Tech Quality Assurance/Quality Control (QA/ <br />QC) Manager, <br />100% DESIGN PS&E <br />Upon direction from the City Project Manager, <br />and based on the review comments on the 00% <br />PS&E, the Community, City and other stakeholder <br />input, we will develop the final construction plans, <br />specifications, and estimates (PS&E). <br />All PS&E deliverables will pass our Internal Quality <br />Control Process, and will meet the standards and <br />requirements of the City, SCRRA, Caltrans, and <br />the Grant. After going through our thorough and <br />established Quality Control process, Tetra Tech <br />will submit 100% PS&E, along with back-up design <br />calculations, models, and technical reports for <br />review and approval. Each submittal will be made <br />an time In accordance with the schedule, <br />We will provide construction specifications for the <br />work, and will thoroughly review the specifications <br />against the plans to ensure their coordination. <br />An Opinion of Costs will be provided by the <br />professional cost estimators we maintain in-house, <br />with a detailed breakdown of work elements, unit <br />prices, material, equipment, and total costs, and <br />will include references for chosen unit costs at each <br />submittal. Our team will offer recommendations for <br />cost savings. The drawings and calculations will <br />be signed and sealed by the Project Manager or <br />Engineer registered in the State of California, <br />CONSTRUCTABILITY REVIEW <br />Prior to the Final PS&E submittal, we will have <br />a thorough Constructability Review performed <br />by an Independent In-house Engineer, following <br />our well -established Constructability Checklist <br />of major items such as long lead Items, Buy <br />America, and construction staging to name a few. <br />Our construction plans will be reviewed to avoid <br />ambiguity, discrepancies, gaps in scope, and <br />smooth coordination between the plans for each <br />discipline, specifications, and estimates. <br />BiD SUPPORT <br />The City will gain from the Tetra Tech team's <br />extensive experience In the preparation of quality <br />bid documents to obtain uniform bids. We strive to <br />reduce the need for changes and addenda, and <br />will offer recommendations on pay Items to cover <br />all of the potential work. The City will also benefit <br />from our support during the bid process to offer <br />clarifications, and utilize our experience evaluating <br />contractor bids to identify unbalanced bids or other <br />issues. <br />QUALITY CONTROL/QUALITY <br />ASSURANCE <br />At Tetra Tech, our methods and techniques for <br />Quality Control (QC) are employed In all phases <br />of work to ensure that the quality requirements <br />are fulfilled for our clients. Quality Assurance (QA) <br />Is integral to our culture and processes, and is <br />ingrained in each task to be properly implemented, <br />Our Quality Assurance has been responsible for <br />driving down the lead time for Project Delivery, and <br />reduces the overall cost of the project by minimizing <br />quality checks, rework and agency delays. <br />The Quality Check process is a formalized step in <br />the delivery process that requires all documents <br />and deliverables to go through an independent <br />review prior to release. The goal is simple: ensure <br />that the product meets the expectations of the <br />client and does not require the City to review the <br />deliverables, This goal keeps rework down and <br />achieves two primary goats: reducing cost and time. <br />Checklists, formal comment/response forms, and <br />redlined QC stamped sets are integral to the Quality <br />Check. <br />First, the QC Manager will conduct a formal review <br />of the deliverable highlighting all reviewed work <br />and redlining the set, Once the review is finished <br />and verified that all redlines have been addressed, <br />the Project Manager will review the set to look <br />TETRATECH i3 <br />