PRINCIPALAWCt-IARCE1LANDSCAPE ARCHITECT • SAN LUIS OBISPO, CA
<br />Mr. Argente has more than 27 years of combined planning and
<br />engineering experience in both the public and
<br />private sectors.
<br />Education
<br />Mr. Argente's main strength is leading complex mufti-disclpiMary
<br />Master Architecture Studies,
<br />projects given his previous experience as a city planner, a
<br />Cal Poly San,Luis Obispo„'.
<br />landscape architect, and project manager of teams of engineers
<br />1596
<br />and scientists. Mr. Argente possesses unique qualifications to
<br />BS, Landscape Architecture
<br />Integrate engineering solence with equal attention to environmental
<br />Cal Poly San Luis Obispo,
<br />and aesthetic concerns, In essence, Mr. Argente is a landscape
<br />1 gg1,
<br />architect that has a solid understanding of hydrology, hydraulics,
<br />earthworks, infrastructure, and construction, As increased urban
<br />Registrations.'
<br />development affects our environment, Mr. Argente has evaluated
<br />Professional Landscape ,
<br />and Implemented solutions that lessen the environmental impacts of
<br />Architect, California, No, 4129
<br />projects or turn them Into environmental assets for the communities.
<br />Qualified SWPPp Developer
<br />Relevant Experience
<br />P
<br />(QSD) and Qualifed SWPPP '
<br />Practitioner (QSP) Certificate
<br />Sixth Street Park, Arts, River and Connectivity (PARG)
<br />No."21105 "
<br />Project, City of Los Angeles Bureau of Engineering, Los
<br />EnvisionTh15ustainability
<br />Angeles, CA. Princlpal•In•Charge responsible for overseeing the
<br />Accredited.Professional .`.;
<br />schematic and final design, environmental documentation and
<br />USGBC = LEED Cerfificatioh "
<br />permitting, public presentations, construction support services,
<br />UVarkshops : j
<br />and post -construction services for nearly 12 acres of recreational
<br />and open spares beneath and around the new bridge. The
<br />Project Management:
<br />project includes approximately % mite of improvements within the
<br />. PSMJ.'— PM Workshop `
<br />Los Angeles River. These Improvements will include bike trails,
<br />Tetra (Tech Project
<br />pedestrian access, and softening of the existing concrete lined
<br />Management Series'
<br />channel. These Improvements were originally envisioned in the
<br />Los Angeles River Revitalization Master Plan that Tetra Tech
<br />Prafess`ianal Affiliations •' '
<br />completed. The City's goal is to make the landscape component
<br />A ASLA • American Society of
<br />under the new bridge a world class public space that will Include
<br />Landscape Architects
<br />an Arts Plaza, several performance stages, synthetic sports
<br />m CECSOC 4 Consulting
<br />fields, river terracing, and bicycle and pedestrian pathways.
<br />Engineers and Land '
<br />Albion Riverside Park Project, City of Los Angeles Bureau of
<br />SurveyorsofCalifornia
<br />Engineering, Los Angeles, CA, Project Manager. Project Manager
<br />Years of Experience
<br />responsible for overseeingthe pre -design services, includingthe
<br />Envision certification process, for the Albion Riverside Park project.
<br />27
<br />Tetra Tech is providing design and construction support services.
<br />The project, located adjacent to the Los Angeles River, Involves
<br />transforming a six -acre site, previously used for dairy warehousing
<br />and distribution, into a riverfront park and recreational facility that
<br />will benefit nearby disadvantaged low income neighborhoods. In
<br />addition, the City is using the redeveloped property to increase the
<br />current capacity for managing storm water runoff, This Important
<br />water quality project is part of the City's overall efforts through the
<br />Proposition 0 Bond Program to Improve water quality and reduce
<br />pollutant loads that are currently being conveyed to the rivers, lakes,
<br />and oceans within the greater Los Angeles area.
<br />
|