Laserfiche WebLink
PRINCIPALAWCt-IARCE1LANDSCAPE ARCHITECT • SAN LUIS OBISPO, CA <br />Mr. Argente has more than 27 years of combined planning and <br />engineering experience in both the public and <br />private sectors. <br />Education <br />Mr. Argente's main strength is leading complex mufti-disclpiMary <br />Master Architecture Studies, <br />projects given his previous experience as a city planner, a <br />Cal Poly San,Luis Obispo„'. <br />landscape architect, and project manager of teams of engineers <br />1596 <br />and scientists. Mr. Argente possesses unique qualifications to <br />BS, Landscape Architecture <br />Integrate engineering solence with equal attention to environmental <br />Cal Poly San Luis Obispo, <br />and aesthetic concerns, In essence, Mr. Argente is a landscape <br />1 gg1, <br />architect that has a solid understanding of hydrology, hydraulics, <br />earthworks, infrastructure, and construction, As increased urban <br />Registrations.' <br />development affects our environment, Mr. Argente has evaluated <br />Professional Landscape , <br />and Implemented solutions that lessen the environmental impacts of <br />Architect, California, No, 4129 <br />projects or turn them Into environmental assets for the communities. <br />Qualified SWPPp Developer <br />Relevant Experience <br />P <br />(QSD) and Qualifed SWPPP ' <br />Practitioner (QSP) Certificate <br />Sixth Street Park, Arts, River and Connectivity (PARG) <br />No."21105 " <br />Project, City of Los Angeles Bureau of Engineering, Los <br />EnvisionTh15ustainability <br />Angeles, CA. Princlpal•In•Charge responsible for overseeing the <br />Accredited.Professional .`.; <br />schematic and final design, environmental documentation and <br />USGBC = LEED Cerfificatioh " <br />permitting, public presentations, construction support services, <br />UVarkshops : j <br />and post -construction services for nearly 12 acres of recreational <br />and open spares beneath and around the new bridge. The <br />Project Management: <br />project includes approximately % mite of improvements within the <br />. PSMJ.'— PM Workshop ` <br />Los Angeles River. These Improvements will include bike trails, <br />Tetra (Tech Project <br />pedestrian access, and softening of the existing concrete lined <br />Management Series' <br />channel. These Improvements were originally envisioned in the <br />Los Angeles River Revitalization Master Plan that Tetra Tech <br />Prafess`ianal Affiliations •' ' <br />completed. The City's goal is to make the landscape component <br />A ASLA • American Society of <br />under the new bridge a world class public space that will Include <br />Landscape Architects <br />an Arts Plaza, several performance stages, synthetic sports <br />m CECSOC 4 Consulting <br />fields, river terracing, and bicycle and pedestrian pathways. <br />Engineers and Land ' <br />Albion Riverside Park Project, City of Los Angeles Bureau of <br />SurveyorsofCalifornia <br />Engineering, Los Angeles, CA, Project Manager. Project Manager <br />Years of Experience <br />responsible for overseeingthe pre -design services, includingthe <br />Envision certification process, for the Albion Riverside Park project. <br />27 <br />Tetra Tech is providing design and construction support services. <br />The project, located adjacent to the Los Angeles River, Involves <br />transforming a six -acre site, previously used for dairy warehousing <br />and distribution, into a riverfront park and recreational facility that <br />will benefit nearby disadvantaged low income neighborhoods. In <br />addition, the City is using the redeveloped property to increase the <br />current capacity for managing storm water runoff, This Important <br />water quality project is part of the City's overall efforts through the <br />Proposition 0 Bond Program to Improve water quality and reduce <br />pollutant loads that are currently being conveyed to the rivers, lakes, <br />and oceans within the greater Los Angeles area. <br />