Laserfiche WebLink
Civil- DESIGN- iRViNE, CA, <br />Mr, Parra has experience In the design of residential, commercial, <br />and municipal development projects, He is proficient In the design Education <br />and preparation of construction documents for design of roads, <br />B8., Civil :Engineering, <br />highways, bike paths, and parking areas, including signing and <br />'California Polytechnic State <br />striping plans. <br />University, San Luls Obispo <br />Mr, Parra has comprehensive knowledge of AUtoCAD Civil 3D, <br />Registrations . <br />AutoCAD 2014, GiS, as well as various hydraulic/hydrologic analysis <br />Engineer in Training (EIT),' <br />software programs to solve complex engineering issues and to <br />Califomia,•No;:152718 <br />analyze the interaction of utilities, grading, and drainage during <br />years of Experience <br />the design process. He Is experienced In WaterOAD, StormCAD, <br />FlowMaster, HEC-RAS, HEC HMS, EPA SWMM, HCS 2010 and <br />4 <br />MATLAS programming. <br />Mr. Parra has experience implementing the State Water Board <br />requirements for preventing and mitigating stormwater pollutants <br />and assisting in preparing Stormwater Pollution Prevention Plans <br />(SWPPP). He Is also experienced in preparing WQMP's and SUSMP's <br />for development and redevelopment projects. <br />Relevant Experience <br />Pacoima Wash Mountain fSilteway, Mia Lehrer and Associates <br />for Mountains Recreation & Conservation Authority (MRCA), <br />Los Angeles, CA, Design Engineer responsible for preparing <br />hydrology and hydraulic calculations for modifications and additions <br />to the storm drain system for the proposed pedestrian bridge over <br />Pacoima Wash, Tetra Tech was contracted by landscape architects <br />Ma Lehrer + Associates (MLA) to prepare the plans, specs, and <br />estimates for the design and construction of a 3,25-mile Class <br />1 Bikeway, Including multi -phase planning, design coordination, <br />administrative approval process and preparation of engineering and <br />construction plans. The new bikeway connects denselypopulated <br />areas of the San Fernando Vaileyto each other, to existing future <br />parks and amenities, and to the Angeles National Forest. The design <br />of the Class I bike path consists of protective fencing along the wash, <br />signage and striping of existing service roads, approximately 1.5 miles ' <br />paved areas, striping of street crossings, protected crossing of a rail <br />bridge, Inclusion of additional bridge crossings over Pacoima Wash, <br />and native landscape planting and irrigation. The bikeway will be <br />planned as multi -use (bicycle, pedestrian and equestrian) and where <br />space allows, a separate and protected path for pedestrians will be <br />Incorporated into the design for maximum safety of users. <br />Upper San Gabriel EWMP Stormwater Capture Projects, <br />City of Industry, Various Locations, CA, Design Engineer. <br />Development of the site Improvements, diversion structure, <br />pretreatment, underground storage reservoirs, and piping systems, <br />Tetra Tech was contracted by the City of Industry to evaluate <br />seven potential site locations for the development of the Upper <br />