GEOMETRICS/ADA COMPLIANCE. / PROJECT ENGINEER < IRVINE,
<br />CA,
<br />Mr, Vu has more then 22 years of civil engineering and design
<br />experience. His background Includes extensive road, utility, water,
<br />Education
<br />sewer and storm drain design for public agencies, His experience
<br />BS, Civil Engineering,
<br />Includes coordination with stakeholders Including state and local
<br />University of California; Irvine,
<br />agencies, utility companies, as well as private businesses to
<br />1995
<br />successfully deliver complex projects, Mr. Vu has a solid working
<br />Registrations
<br />knowledge of AutoCAD, Land Desktop Development, Civil $D,
<br />MlcroStation V81, Civil Design, AES, WSPG, FlowMaster, and MCRA
<br />Licensed Professional `.
<br />software.
<br />Engineer, California, No.
<br />61015,2000 '.
<br />Relevant Experience
<br />Yews of Experience
<br />Active Transportation Project (ATP) 2 and 2, City of Los
<br />22
<br />Angeles, Bureau of Engineering, Los Angeles, CA. Project
<br />Engineer, Responsible for quantlty take -off and cost estimate for the
<br />Boyle Heights Linkage Project active transportation projects (ATP 2),
<br />The goal of ATP 2 is to improve pedestrian safety and access to the City
<br />of Los Angeles' Sixth Street Viaduct and Sixth Street PARC Projects,
<br />specifically aiming to Improve the pedestrian circumstances for users
<br />of the Aliso Pico Recreation Center, Pecan Recreation Center, and Boyle
<br />Heights Technology Youth Center. A second ATP project, ATP 3, benefits
<br />the Downtown Los Angeles Arts District, The ATP 3 Project will provide
<br />pedestrian and cyclist Improvements including new cycle tracks, bike
<br />lanes, bike routes, new and widened sidewalks with curb extensions,
<br />new traffic controlled intersections, a new shared street connecting
<br />to the new Sixth Street Viaduct Arts Plaza, as well as green street
<br />elements. The goal of these two Caltrans Local Assistance Program
<br />funded projects Is to Increase the mobility and safety for non -motorized
<br />users to achieve the regional agency's greenhouse gas reduction
<br />goals, and aid in the enhancement of the public's health. Tetra Tech is
<br />currently preparing the Pre -Design Reports for both the ATP 2 and ATP
<br />3 project.
<br />Realignment of Culver Boulevard, City of Culver City, Culver
<br />City, CA, Project Engineer, Responsible for pavement design, utility
<br />relocation, roadway plans and profiles, and ADA ramps, Tetra Tech
<br />Is contracted by the City of Culver City to prepare final construction
<br />plans and speoificatlons for the widening of Culver Boulevard between
<br />Sepulveda Boulevard and Elenda Street. The project consists of
<br />roadway reconfiguration, including a new raised median on Culver
<br />Boulevard separating east and west bound traffic lanes and left turn
<br />pockets, reconfiguration of the existing raised landscaped bicycle and
<br />pedestrian median on the north side of Culver Boulevard, new traffic
<br />signals, sidewalk replacement, street lighting replacement, bus pads,
<br />drought -resistant landscaping for the medlans, and a bioswale in the
<br />north median to capture water run-off.
<br />Potrero Canyon Park Development Project, City of Los
<br />Angeles, Bureau of Engineering, Los Angeles, CA. Design
<br />Engineer, Responsible for preparing the final Plans, Specification,
<br />
|