of Potrero Canyon, requiring
<br />stabilizing the canyon walls,
<br />creating a natural riparian park
<br />with native vegetation, Including an
<br />intermittent natural water way that
<br />will be fed by cleansed stormwater.
<br />Metro - Cerritos Hotspots,
<br />Los Angeles Metro, Los
<br />Angeles, CA. Lead Design
<br />Engineer, Performed intersection
<br />Improvements to reduce
<br />congestion for two arterial
<br />roadways, Responsibilities Included
<br />roadway plan and profile, striping
<br />plan, typical pavement sections
<br />and cost estimates. The project
<br />added one additional left -turn
<br />lane north and south bound at
<br />Bloomfield Avenue and Artesia
<br />Boulevard, and one additional
<br />south bound left -turn lane at
<br />Carmenita Road and South Street,
<br />Owens Lake Dust Control
<br />Mitigation Pro act, Phase T5a1
<br />and 7a, City of Los Angeles,
<br />Department of Water and
<br />Power, Los Angeles, CA. Project
<br />Engineer. Responsible for multiple
<br />design, multi -agency coordination,
<br />as -built drawing searches, and
<br />submittal package' preparation.
<br />Performed engineering calculations
<br />for pipeline control data and for the
<br />previous Phase T5-1 of the project,
<br />This dust control mitigation project
<br />prevented the dust from becoming
<br />airborne around the Owens Lake
<br />area, which has dried because of
<br />the City of Los Angeles' diversion
<br />of water from the Owens River for
<br />water supply. Phase 7a Included
<br />a 6-mlle area and involved the
<br />Great Basin Unified Air Pollution
<br />Control District requiring the City
<br />to provide mitigation of air quality
<br />while protecting water rights. Mr.
<br />Vu's work involved the preliminary
<br />design and development of
<br />a Design -Build RFP for the
<br />construction of a flood irrigation
<br />system for T54, Including the
<br />design of a water pump, irrigation
<br />layout, and filtration system Raymond Avenue Railroad
<br />modification, Grade Separation Design
<br />Review Orange County Transit
<br />1.405 Improvements Project,
<br />Orange County Transit
<br />Authority (OCTA), Orange
<br />County, CA, Utility Engineer,
<br />Developed the utility relocations for
<br />54 utility owners impacted by the
<br />1-405 Improvements Project, The
<br />project includes 160 utility conflicts
<br />for a total utilities scope of work
<br />worth over $400M. Tasks Included
<br />identifying and recommending
<br />relocations, cost estimating, and
<br />plans of action regarding impacted
<br />utilities. Additional duties included
<br />the Investigation of real estate
<br />prior rights, ownership, property
<br />acquisition and feasibility studies
<br />regarding relocation of large
<br />sewers, water mains, and other
<br />utilities.
<br />Rosedale Highway Widening
<br />Project, City of Bakersfield,
<br />Bakersfield, CA, Senior Project
<br />Engineer, Responsible for roadway
<br />plan and profile, striping plan,
<br />pavement delineation, drainage
<br />design, drainage plans and
<br />profiles, hydrology and hydraulic
<br />calculations, and final PS&E,
<br />The project included adding two
<br />additional lanes for each way,
<br />removing and replacing all existing
<br />storm drain facilities that were
<br />affected by the widening, and verify
<br />end confirm the adequate capacity
<br />of offsite detention basins.
<br />Authority (OCTA), Fullerton,
<br />CA. Project Engineer. Responsible
<br />for the roadway design,
<br />eonstruetabllity and bid document
<br />reviews, The project scope included
<br />lowering Raymond Avenue below
<br />the BNSF tracks and Valencia
<br />Drive, a local road located adjacent
<br />to the tracks, to alleviate existing
<br />and potential Impacts to motorists
<br />and the environment. The BNSF
<br />corridor runs east/west through
<br />the City of Fullerton. Raymond
<br />Avenue is one of three remaining
<br />at -grade crossings on arterial
<br />streets within the city. The project
<br />was one of seven grade separation
<br />projects designed along the BNSF
<br />Orangethorpe Railroad Corridor
<br />under the program management of
<br />OCTA. Tasks Included coordinating
<br />between disciplines to receive a
<br />final PS&Efrom design engineers
<br />and distribute to reviewers. Also,
<br />responsible for review of the
<br />roadway PS&E documents.
<br />The Crenshaw/LAX Transit
<br />Corridor Project, Los Angeles
<br />Metro, Los Angeles, CA.
<br />ProJect Engineer. Responsible
<br />for the discovery research to
<br />Identify utility groups and obtain
<br />records and documents relative
<br />to as-bulits and substructures,
<br />and conducting field surveys to
<br />verify all existing underground and
<br />overhead facilities and proposed
<br />relocations. The projects 8.5-mile
<br />line will connect the Metro Green
<br />Line and the Expo Line currently
<br />under construction at Crenshaw
<br />and Exposition Boulevards. This
<br />role required extensive Interaction
<br />With utility Companies and local
<br />agencies, including, but not limited
<br />to: LAWA, City of Inglewood DPW,
<br />LADWR LABOE, and LACFCD,
<br />
|