Laserfiche WebLink
system studies that included load <br />flow, short rlrouft and arc flash <br />calculations, and Integration with <br />the city's SCADA system. <br />Elizaboth Reservoir, Booster <br />Pump Station and Well No. <br />29, City of South Gate, South <br />Gate, CA. Engineering design <br />services for a water storage tank <br />and booster pump station and <br />a water well with disinfection <br />equipment. Electrical engineering <br />services Included three new <br />12$ horsepower booster pumps <br />and adding and Installing new <br />conduits end wires to the new <br />pumps, Responsible for preparing <br />plans, specifications, and load <br />calculation to modify the facility's <br />extensive distribution system, Site <br />Investigations were conducted <br />to verify ratings, settings, and <br />locations of equipment. Working <br />with utility company to provide <br />new service to the project. <br />Pyrite Canyon Treatment <br />Facility, State of California, <br />Department of Toxic <br />Substances Control, Glen <br />Avon, CA, Performed design of <br />electrical power and distribution <br />system for a new treatment <br />facility, The design included sizing <br />solar system to feed the new <br />plant, sizing power equipment <br />like inverters, step up and step <br />down transformers, overhead <br />and underground distribution, <br />switchboard, MCC and cable trays, <br />performing load flow and short <br />circuit studies using ETAP power <br />modeling software. <br />Maxine Lift Station Bypass <br />Connection Project, City <br />of Santa Ana, Santa Ana, <br />CA. The purpose of the Maxine <br />Lift Station Bypass Connection <br />Project was to install a connection <br />on the existing force main that <br />would allow the City to bypass <br />sewer flows around the existing lift <br />station utilizing a portable pump <br />from the existing wet well to the <br />force main. Managed the electrical <br />power system studies which <br />included load flow, short circuit, <br />and arc flash calculations. <br />Burris pump Station, Orange <br />County Water District, <br />Fountain Valley, CA. Electrical <br />Engineer for the de»sign of the <br />new Burris Pump Station which <br />consists of four 1,750 horsepower <br />vertical turbine pumps delivering <br />a maximum flow rate of 200 <br />efs to the Santiago Basins from <br />Burris Basin. Work consists of <br />reviewing the Burris Pump Station <br />construction phase shop drawings, <br />performing design revision, and <br />providing answers to RFIs. <br />Donald C. Tillman Water <br />Reclamation Plant Electrical <br />Modifications, City of <br />Los Angeles, Bureau of <br />Engineering, Van Nuys, CA. <br />Project Manager responsible for <br />preparing electrical engineering <br />design that include plans, <br />specifications, and cost estimate <br />to modify the facility's medium <br />voltage power distribution system. <br />The pro Ject consists of upgrading <br />old medium voltage switohgears <br />with two new 4160V, 3000A ones <br />and converting loop system to <br />dual radial system and providing <br />power redundancyfor the whole <br />plant„ The project also included <br />site investigations to verify' <br />ratings, settings, and locations <br />of equipment and performing <br />electrical power system studies <br />that include load flow, short circuit <br />and are flash calculation using <br />ETAP software. Project is currently <br />In construe-tion phase, <br />Carlsbad Seawater Desalter <br />Conveyance Pipeline, <br />Poseidon Resources <br />Corporation, Carlsbad, CA. <br />Man -aged electrical design for <br />52,000 linear feet of pipeline that <br />serves the product water from <br />the planned 50 mgd desalination <br />plant In the City of Carlsbad. <br />Pipeline diameter is 544noh' <br />welded steel pipeline operating at <br />a maximum pressure of 500 psi. <br />The pipeline Is routed through the <br />cities of Carlsbad, San Marcos, <br />and Vista, The electrical de -sign <br />Included designing power for <br />cathodic protection system at <br />multiple locations <br />Santa Ana River interceptor <br />Relocation Project, Orange <br />County Flood Control District, <br />Santa Ana, CA. Provided <br />preliminary and final electrical <br />design services for relocation of <br />19,500 linear feet segment of <br />54•Inch trunk interceptor, 6,000 <br />linear feet of 15- and 18-inch <br />sower mains, flow metering <br />station and the decommissioning <br />of the existing trunk Interceptor <br />segment. The project included <br />the Installation of two separate <br />siphons below the Santa Ana River <br />using microtunneling construction <br />method while complying with <br />multiple environmental and per- <br />mitting constraints. <br />San Lorenzo Sewage Lift <br />Station, City of Santa Ana, <br />Santa Ana, CA.' San Lorenzo <br />Sewage Lift Station Im- <br />provements include a wet well, <br />dry well, three variable frequency <br />drive pumps, aboveground CMU <br />block control room, emergency <br />generator, hardscape and <br />landscape Improvements, and <br />approximately 1,300 linear feet of <br />new sewer main. As the Electrical <br />Engineer Mr. Kassar preformed <br />electrical power system studies <br />that included load flow, short <br />circuit, and arc flash calculations. <br />