SURVEYING/MAPPING- iRVINE, CA,
<br />Mr. Culllson has fifteen years of experience in land surveying for
<br />municipal, federal and private sector projects including control
<br />Education
<br />network surveys, boundary and topographic surveys, subdivision
<br />B.S., Geography; Texas State
<br />mapping, as -built surveys, and construction staking for a wide
<br />University San Marcos, TX,
<br />variety of projects. Additionally, he has considerable experience
<br />2001
<br />researching boundary and chain of title Information and preparing
<br />Registrations
<br />legal descriptions, Lot Line Adjustments, Voluntary Mergers, and
<br />Corner Records, Mr, Culllson has comprehensive knowledge In
<br />Professional Land Surveyor,
<br />the use of Robotic Total Stations, GPS Surveying equipment, Data
<br />"Californla, No.8641, Year'2000 >'
<br />Collectors, AutoCAD Civil 8D software, AmGIS software, and Trimble
<br />Professional Affiliations
<br />Business Cantor,
<br />American Society oCivil f'
<br />Relevant EXpeilGflCE
<br />Engineors (ASCE) '
<br />California Land. Surveyors
<br />Camp Pendleton -Mary Fay Elementary School Boundary+
<br />Association (CL:SA) '
<br />Lease, Naval Facilities Engineering Command (NAVFAC)
<br />years of Experience -
<br />SW, San Diego, CA, Project Surveyor, Mr. Culllson is responsible
<br />for overseeing the field and office survey work needed to rewrite
<br />15
<br />the lease document legal descriptions for the Mary Fay Elementary
<br />School Boundary and the Da Luz Housing complex PPV boundary
<br />adjacent to the school site. Tetra Tech was hired to perform
<br />topographic and boundary surveys of the current lease areas and
<br />Infrastructure and to write new legal descriptions and exhibits that
<br />would not only correct overlaps in the existing documents but would
<br />respect and facilitate the future expansion plans at the Mary Fay
<br />Elementary School site.
<br />Records research and Mapping Services for Defense
<br />Fuel Supply Point, San Pedro to Pier 12, Naval Facilities
<br />Engineering Command (NAVFAC) SW, Long Beach, CA.
<br />Project Surveyor, Mr. Culllson is responsible for overseeing this
<br />complex project to understand the current state of ownership, as
<br />well as how that ownership was original acquired for approximately
<br />9 miles of government owned underground fuel lines, Research
<br />was performed in records with NAVFAC, DLA, GSA, BRAG, Port of
<br />Los Angeles, Port of Long Beach, the City of Long Beach, the City
<br />of Los Angeles, and the County of Lost Angeles to acquire the
<br />various deeds, leases, licenses, and court actions that created the
<br />permissions, both fee and less than fee, that allow those gas lines
<br />to be placed In their current locations. Tetra Tech originally reviewed
<br />10'8 of thousands of pages of documents, maps and other records to
<br />determine applicability to the current pipeline alignment, Deliverables
<br />for this project included updated and organized Muniment Files and a
<br />Pipeline Mapping Exhibit (PME).
<br />Airfield Pavement Topographic Surveys, Naval Facilities
<br />Engineering Command (NAVFAC) SW, Various Locations,
<br />Project Surveyor. Mr. Cullison is responsible for overseeing the
<br />coordination of the field and office survey work for this fast paced,
<br />data intensive product. NAVFAC Public Works Is tasked with
<br />managing the condition assessment of airfield pavement for all of
<br />
|