My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
DUDEK
Clerk
>
Contracts / Agreements
>
D
>
DUDEK
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/8/2018 4:35:25 PM
Creation date
10/8/2018 4:33:32 PM
Metadata
Fields
Template:
Contracts
Company Name
DUDEK
Contract #
A-2018-223
Agency
PUBLIC WORKS
Council Approval Date
9/18/2018
Expiration Date
9/17/2020
Insurance Exp Date
1/1/1900
Destruction Year
2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
51
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
BOB OHLUND, PE — CONTINUISD <br />Features of the new ponds include three 2,000 gpm floating pump stations, approximately 2,500 If of 16 - <br />inch to 36 -inch inlet and discharge piping, and 36 -inch diameter steel pipelines and isolation valves to <br />interconnect the new ponds to each other and to the existing adjacent Trumble Road Recycled Water <br />Pond. Access roads to the bottom of the ponds with landing platforms for cranes will also be provided, <br />The project also includes improvements to two existing recycled water ponds, the 117 MG Case Road Pond <br />and the 50 MG Watson Road Pond. These improvements include new 2,000 gpm floating pump stations and <br />associated inlet and discharge piping, electrical and SCADA system upgrades, and deepening of Case Road <br />Pond to optimize the storage capacity at that site. <br />Recycled Water Use & Seasonal Storage, Diamond Valley Lake Area, Eastern Municipal Water <br />District, California. Project manager to prepare an initial feasibility analysis to identify and evaluate <br />potential alternatives for the use and seasonal storage of recycled water in recreational areas adjacent to <br />the east and west dams of Diamond Valley Lake, in Riverside County, CA. Specific issues researched for the <br />study included; <br />• Opportunities and barriers to recycled water use for landscape and recreational purposes, <br />• Opportunities for winter storage of recycled water for meeting -summer demand, <br />• Potential for groundwater percolation and re -pumping for summer supply and associated impacts, <br />• Pond design issues including liner alternatives, <br />• Water quality issues and constraints, landscape irrigation and storage of recycled water, <br />• Regulatory, environmental and Institutional requirements and constraints, <br />• East Valley Management Plan issues and constraints. <br />Syphon RW Seasonal Storage Reservoir & Multi -Zone Pump Station, Irvine Ranch Water <br />District, California. Mr. Ohlund provided evaluation of integrating this new, seasonal recycled water <br />storage reservoir into the IRWD recycle water system. Modification to current system operation was <br />analyzed as this reservoir will become a significant source of supply in the high demand months, in <br />addition to operational modifications and system improvements associated with conveying large supply to <br />fill the reservoir in low demand months. Dudek further prepared the preliminary design of a multl-zone <br />recycled water pump station (32,000 gpm total pumping capacity). System operation, reservoir, pump <br />stations, disinfection and pipe sizing was considered to maximize storing the excess recycled water supply <br />potential from two reclamation plants in the winter months, yet balancing the sizing of facilities with future <br />demands. A new multi -zone pumping station, including the ability to pump to three different pressure <br />zones to take advantage of system head to provide an energy efficient design, strainer facilities to filter <br />algae and other biomatter, and both disinfection and dechlorination facilities were defined and preliminary <br />design provided. Dudek additionally prepared environmental documentation for the facilities discussed <br />above as well as the overall dam raising project. <br />Canyon Lake Treatment Plant Intake Facility Replacement, Elsinore Valley Municipal Water <br />District — Principal -in -charge for the design of a new intake facility which draws water from Canyon Lake <br />and pumps to the treatment plant. Facilities included the relocation of a floating pump platform, 500 -feet <br />of new 30 -inch transmission main, and injectors for the injection of chlorine, acid, polymer and alum. <br />DUDEK Page 2 of 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.