My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
TERRACON CONSULTANTS, INC.
Clerk
>
Contracts / Agreements
>
T
>
TERRACON CONSULTANTS, INC.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/15/2019 9:11:39 AM
Creation date
10/8/2018 4:33:36 PM
Metadata
Fields
Template:
Contracts
Company Name
TERRACON CONSULTANTS, INC.
Contract #
A-2018-192
Agency
PUBLIC WORKS
Council Approval Date
8/21/2018
Expiration Date
8/20/2021
Insurance Exp Date
1/1/2020
Destruction Year
2026
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
74
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Environmental a Facilities a Geotechnical a Materials <br />if such equipment will not be reused, proper removal and disposal will be recommended. <br />Access restrictions may prevent Terracon's inspector from safely observing elevators and/or <br />lifts. Terracon requests to have building maintenance staff escort our personnel during this <br />task, if required. <br />Mercury — The presence, location and condition of suspect mercury -containing equipment such <br />as fluorescent, mercury vapor, high-intensity discharge (HID) and other lamps, and liquid <br />mercury -containing equipment such as switches, thermostats, temperature controls and heating <br />ventilation and air conditioning (HVAC) devices will be assessed. Terracon will consult with the <br />client, and if such equipment will not be reused, proper removal and disposal will be <br />recommended. <br />CFCs — The presence, location and condition of suspect CFC -containing equipment, such as <br />refrigerators, air conditioning units, and walk-in coolers and freezers will be assessed and <br />external labels (indicating CFC content) and serial numbers will be recorded. Terracon will <br />consult with the client, and if such equipment will not be reused, proper removal and disposal, <br />and proper draining of suspect CFC -containing fluid will be recommended. <br />Tritium — The presence, location and condition of suspect tritium -containing EXIT signs will be <br />assessed and signs with external labels (with a warning label that indicates tritium [or H-3], <br />displays the three -bladed radiation warning symbol, and/or states "Caution — Radioactive <br />Materials") will be recorded. Terracon will consult with the client, and if such EXIT signs will not <br />be reused, proper removal and disposal will be recommended. <br />REPORTS <br />The results of the asbestos, lead and hazmat survey services will be presented under separate <br />report. The comprehensive report will include, but not limited to, sample summaries, regulatory <br />overview, sample location diagram, photos of asbestos containing materials (ACM), and a peer <br />review by a Certified Asbestos Consultant (CAC). Terracon will recommend conducting a <br />thorough asbestos survey prior to disturbance of suspect ACM during the planned building <br />demolition activities. Should the building be occupied at the time of the initial hazardous <br />materials survey, Terracon will not conduct destructive sampling and "assume" materials to <br />contain asbestos. A supplemental survey will be recommended once the propertied are <br />unoccupied to complete the survey with more thorough destructive sampling strategies. <br />Reliance — The reports will be prepared for the exclusive use and reliance of the City of Santa <br />Ana. Reliance by any other party is prohibited without the written authorization of the client and <br />Terracon. <br />If the client is aware of additional parties that will require reliance on the reports, the names, <br />addresses, and relationship of these parties should be provided for Terracon approval prior to <br />the time of authorization to proceed. Terracon may grant reliance on the reports to those <br />approved parties upon receipt of a fully executed Reliance Agreement (available upon request) <br />and receipt of information requested in the Reliance Agreement. If, in the future, the client and <br />Terracon consent to reliance on the reports by a third party, Terracon may grant reliance upon <br />receipt of a fully executed Reliance Agreement, requested information and receipt of an <br />additional minimum fee per relying party. <br />SCHEDULE <br />We know how important establishing and meeting project schedules is to the success of City <br />projects. Our team will work closely with the City Project Manager to understand schedule <br />requirements and endeavor to meet or exceed these deadlines, working with you at all times to <br />meet your goals. For this project, we have assumed a standard schedule will meet your needs. <br />1 f City of Santa Ana Public Works Agency— Various Environmental Services (RFP No. 18-043) 17 <br />— A2 Hazardous Materials Surveys <br />
The URL can be used to link to this page
Your browser does not support the video tag.