<br />Ms. Jennifer Moore has more than 20 years of experience in construction quality
<br />management, inspection and testing that spans a variety of high profile public
<br />works projects. She has hands-on experience as an inspector and technician and has
<br />progressively increased her level of responsibilities throughout her career. She has
<br />in-depth knowledge of the standard tools and equipment utilized in construction
<br />and in the sampling and testing of construction materials as well as knowledge of
<br />mathematics and the methods used for computation of construction items.
<br />RELEVANT PROJECT INVOLVEMENT/ EXPERIENCE
<br />CITY OF POMONA ON-CALL, POMONA
<br />Public Works Technician I Ms. Moore Services Quality Control Coordinator for the City of Pomona. RMA Group's services consist
<br />of office research, field exploration, laboratory testing, review of the compiled data, and preparation of a written report containing
<br />recommendations developed in accordance to generally accepted engineering and geologic principles and practices.
<br />1-405 / SEPULVEDA PASS WIDENING PROJECT, LOS ANGELES
<br />Public Works Technician I Ms. Moore's responsibilities included ensuring that the inspection and testing for the project were
<br />completed in accordance with specified frequencies, overseeing the day-to-day construction quality by managing workmanship
<br />inspections, overseeing production testing, and maintaining project inspection and testing documentation including filing daily
<br />reports and coordinating monthly audits of quality assurance records by Department, State, and Federal oversight agencies.
<br />Jennifer also ensured that all testing personnel and on and off-site field labs had current certifications as required, and that
<br />materials incorporated into the work met the requirements of the contract documents. Hertesting and inspection services included
<br />materials and laboratory testing of the embankment, MSE walls, aggregate base, asphalt concrete, Portland cement concrete, and
<br />sub -grade, and inspection of roadway construction, bridge construction, and pile construction.
<br />SR -71/ MISSION BOULEVARD INTERCHANGE, POMONA
<br />Public Works Technician I Ms. Moore served as Quality Control Coordinator for the SR -71 / Mission Boulevard Interchange Project.
<br />RMA Group staff was responsible for all aspects of materials testing for the project. All staff assigned to the project were Caltrans
<br />certified for the tests they performed. The number and types of tests required were determined in accordance with the current
<br />Caltrans Construction Manual Chapter 6. Our staff performed all of their testing in accordance with Caltrans test methods.
<br />NOGALES GRADE SEPARATION, CITY OF INDUSTRY
<br />Public Works Technician I Ms. Moore served as Quality Control Coordinator for the Nogales Grade Separation Project. RMA Group
<br />provided quality control services including the quality control manager, inspectors, and technicians to support the project. Our
<br />quality control inspectors provided a full range of inspections including special inspection of reinforced concrete, welding, earthwork
<br />and paving operations as well as electrical inspection for signals and rail systems. Our technicians performed field and laboratory
<br />testing of soils, aggregate bases, ballast, Portland cement concrete, and asphalt pavements.
<br />1-15 / 1-215 DEVORE INTERCHANGE IMPROVEMENTS, SAN BERNARDINO COUNTY
<br />Public Works Technician I Ms. Moore served as Construction Inspector for the 1-15 / 1-215 Devore Interchange Improvements
<br />Project. RMA Group provided quality assurance testing of materials for this project including observation, inspection, and testing
<br />of JPCP pavement (143,000-cy), structural concrete for CIP retaining walls (32,550-cy), Rapid Set Concrete (RSC - 22,000-cy), lean
<br />concrete base, Hot Mix Asphalt pavement (63,000 tons), testing for relative compaction of 1.8 million cubic yards of embankment,
<br />24,000 cubic yards of structure backfill, and compaction and corrosion testing of MSE wall backfill, tension and bend testing
<br />of reinforced steel, and inspection and testing of 3,400 soil nails. In total, there were 10 bridge reconstructions and five new
<br />constructions.
<br />STATE ROUTE 210, SEGMENTS 9, 30, & 11 AND SEGMENT 11 EARLY PROJECTS, SAN BERNARDINO COUNTY
<br />Public Works Technician I Ms. Moore's responsibilities included ensuring that the inspection and testing for the project were
<br />completed in accordance with specified frequencies, overseeing the day-to-day construction quality by managing workmanship
<br />inspections, overseeing production testing, and coordinating regularly with the Resident Engineer for inspection of highway
<br />construction for the four segments undergoing concurrent construction. Jennifer also maintained project inspection and testing
<br />documentation, filed daily reports in accordance with the Department Construction Manual, and coordinated monthly audits of
<br />quality assurance records by Department, State, and Federal oversight agencies.