Laserfiche WebLink
• Soil Liquefaction <br />• Slope Stability and Protection <br />• Construction Inspection <br />• Open and Braced Excavations (shallow) <br />• Grading and Site Clearing <br />• Pavement Design <br />• Foundation Design <br />• Retaining Structures- submerged and partially submerged <br />• Fill Compaction <br />• Special Inspections <br />• Subsurface Geotechnical Investigation <br />The Consultants shall also provide services such as: field exploration, laboratory testing and <br />instrumentation. <br />The work in general, consists of work in the following areas and not limited to: <br />If there are any exceptions to the core of requested services, proposers shall list said exceptions <br />in their proposal (matrix form). <br />For specialized work for which the prime consultant shall require a sub -consultant, the prime <br />consultant shall serve as an administrative liaison between the City and the sub -consultant. <br />The selected consultants must have the expertise, experience, and demonstrated resources <br />available to perform the work described in this RFP. <br />General Requirements and Project Deliverables <br />The Consultant's services for the project preparation, special studies/investigations shall include <br />and in be in conformance with the latest editions of the following: The City of Santa Ana <br />Municipal Code (SAMC), professional Standards established by the City, and or federal, state <br />and local guidelines established in the project. <br />The Consultant shall have complete responsibility for the accuracy and completeness of all <br />documents and plans prepared. The plans will be reviewed by the City of Santa Ana for <br />conformity with the requirements of the Agreement. Reviews by the City of Santa Ana do NOT <br />include detailed review or checking of design or the accuracy with which such designs are <br />depicted in the documents and the plans. The documents and plans furnished under the <br />Agreement shall be of a quality acceptable to the City of Santa Ana. The criteria for acceptance <br />shall be a product of neat appearance, well organized, technically and grammatically correct, <br />checked, and dated and having the maker and checker identified. <br />The Consultant shall have project management control procedures in effect during the entire time <br />work is being performed under the Agreement. This task shall include the following: <br />• Project Management Plan- the consultant shall provide a detail management plan <br />including information and coordination with other agencies to ensure compliance and <br />completion of the tasks. This plan shall include all milestones and task breakdown for <br />each of the tasks and subtasks included therein. The project management shall be <br />City of Santa Ana RFP 18-045 <br />2'SV2f6 <br />