My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
25B - AGMT - GEOTECH SRVS
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2018
>
11/20/2018
>
25B - AGMT - GEOTECH SRVS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/15/2018 9:16:31 PM
Creation date
11/15/2018 9:12:28 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
25B
Date
11/20/2018
Destruction Year
2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
194
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
submitted to the Project Manager for review and within 15 calendar days of the issued <br />Notice to Proceed <br />• Deliverables <br />• Quality Control/Quality Assurance (QA/QC) Plan <br />• Project Schedule/Invoicing <br />• Project Correspondence <br />In case of conflict, ambiguities, discrepancies, errors, or omissions, the consultant shall submit <br />the matter to the City for clarification. <br />However, work tasks may include studies or a variety of engineering tasks. If requested by the <br />City, the Consultant shall provide a Work Plan which includes a detailed schedule of the <br />assigned project prior to the issuance of Notice to Proceed and/or Task Order. Specific Task <br />Orders with Notices to Proceed ("NTPs") will be provided for project(s) at the discretion of the <br />City. Work required per Task Order shall comply with the Scope of Services and additional <br />provisions in each Task Order and this agreement. <br />The following services/items shall include, but are not be limited to: <br />1. Research existing records of utility companies and agencies and coordinate with the involved <br />parties. <br />2. City may opt to receive only PDF versions of the plans, reports, and studies for reviewing <br />purposes. If so, the Consultant team will provided plans and/or specifications accordingly. <br />3. The Consultant shall monitor the project progress, maintain project files, and control the <br />quality of the work performed by in-house staff and/or sub -consultants. Incomplete (not <br />meeting targeted completion) or poor quality work will not be accepted. The Consultant <br />shall revise the documents within a revised schedule set by the City, which may require <br />overtime. No additional compensation necessary for the consultant to complete this work to <br />the satisfaction of the City shall be approved by the City for the required revisions. It is the <br />responsibility of the Consultant to produce a professional -level quality of work product. <br />4. If included in the on-call project scope, attend meetings with the City staff as required. <br />5. If included in the on-call project scope, the Consultant shall coordinate permits and any other <br />issues with the City, other Agencies, and all utility companies as required. At the direction <br />of the City, the Consultant shall be the liaison with affected agencies. <br />6. If included in the on-call project scope, the Consultant shall be responsible for reviewing and <br />approving addenda and clarifications. <br />All information regarding the plans and specifications and or documentation related to the <br />project and approved by the City, will then become property of the City. <br />A more detailed scope of work will be provided when/if a specific project or Task Order <br />proposal is requested of a consultant. All tasks orders shall include the staff title, hours, hourly <br />rate and totals as related to the project. <br />Project Schedule and Progress: <br />City of Santa Ana RFP 18-045 <br />247 <br />
The URL can be used to link to this page
Your browser does not support the video tag.