Laserfiche WebLink
i) The chosen contractor will be required to register with Southern California Edison as a <br />Trade Professional (Trade Pro). Directions to register can be found at: <br />hftps://sceonlineapp.com/CAASupi)ort/Default.aspx. Please note that contractor will <br />NOT be required to produce a Project Feasibility Study or Energy Efficiency Project <br />Influence Job Aid. <br />j) Any other cost of business fees/expenses associated with performing City work are to be <br />included in the bid. <br />k) Provide factory start up and training (if necessary) to ensure proper functionality of new <br />lighting equipment and controls. <br />1) All work shall be warranted against defects in material and workmanship for a period of <br />one year from the date of acceptance. Any applicable warranty information beyond this <br />should be stated and provided upfront. <br />m) The contractor is required to provide a detailed and itemized invoice that clearly states <br />the quantity of each fixture installed. Additionally, the invoice shall show a breakdown of <br />material, labor, tax, shipping, and any other applicable project costs. <br />n) It is the Contractor's responsibility to submit a final version of the Lighting Inventory, <br />Attachment A in parallel with the submittal of the Cost Proposal. Any revisions required <br />to the Scope of Work must be clearly indicated in the final Lighting Inventory and <br />reflected in the Cost Proposal. The final Lighting Inventory Table serves to inform the <br />Agency. <br />o) Contractor will be compensated for work performed and fixtures installed. Any increase <br />on the Base Price due to larger inventory will require written approval by the Agency and <br />will follow procedures set forth for change orders. Any decrease on Base Price due to <br />smaller inventory will result in a lower Base Price to the Contractor. <br />p) The Contractor shall conduct all work between in the time window established after the <br />contract is awarded. <br />q) The Contractor shall comply with safety requirements and practices as outlined in <br />accordance with Agency requirements and California Occupational Health and Safety <br />Administration (Cal/OSHA). <br />r) The Contractor shall do all that is necessary to maintain a safe working environment for <br />Contractor's employees, Agency and facility employees and the general public present. <br />s) The Contractor shall work with the Agency facility staff to understand and abide by any <br />site specific security procedures. <br />25D-32 <br />