Laserfiche WebLink
t) The Contractor shall clean up any construction dust, dirt and debris from work surfaces or <br />equipment after work is completed each day and prior to occupancy. <br />u) The Contractor shall be very careful to leave the facility with no damage to its structure, <br />contents, existing finishes, and with no evidence of cutting or patching, and with all fixtures <br />and lenses cleaned. <br />v) The Contractor is responsible for securing all necessary permits, including Title 24 energy <br />code documentation and compliance permit, and shall abide by local laws and regulations. <br />w) Prior to ordering of equipment and fixtures, Contractor is to verify fixture quantities, types <br />and installation needs, including specifying equipment that complies with existing <br />electrical service. Final project invoice price will be based upon the quantity of each fixture <br />type installed multiplied by the unit price for that fixture. <br />25D-33 <br />