My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
25I - AGMT - GG BLVD AND MAIN ST
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2018
>
11/20/2018
>
25I - AGMT - GG BLVD AND MAIN ST
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/15/2018 9:19:22 PM
Creation date
11/15/2018 9:13:13 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
25I
Date
11/20/2018
Destruction Year
2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
46
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
COOPERATIVE AGREEMENT NO. C-8-1800 <br />MAIN STREET— RTSSP <br />1 ARTICLE 4. RESPONSIBILITIES OF THE AUTHORITY AS PROJECT LEAD AGENCY <br />2 The AUTHORITY as the LEAD AGENCY agrees to the following responsibilities for the <br />3 Implementation of the PROJECT: <br />4 A. AUTHORITY shall act as the LEAD AGENCY for the work necessary to manage, procure, <br />5 and complete the PROJECT as Identified in APPLICATION. <br />6 B. To coordinate outreach with PARTICIPATING AGENCIES for PROJECT. <br />7 C. To collect all data necessary to provide new optimized timing plans including, but not <br />8 limited to, manual or video all movement counts at each PROJECT signalized Intersection, and a mutually <br />9 agreed upon number and location of twenty-four (24) hour / seven (7) day automated machine traffic <br />10 counts with vehicle classification. <br />11 D. To develop and Implement new timing plans optimized for signal synchronization. <br />12 E. To provide updated timing plans for all control systems and all relevant data used to <br />13 develop said plans to PARTICIPATING AGENCIES. <br />14 F. To prepare a "Before and After Study" for PROJECT as described in the Measure M2 <br />15 Eligibility Guidelines adopted by the AUTHORITY. The "Before and After Study" for the project is <br />16 considered the equivalent of the required Project Final Report (Measure M2 Ordinance No. 3, Section <br />17 6.111.9) for PROJECT. The AUTHORITY shall provide the "Before and After Study" to the <br />18 PARTICIPATING AGENCIES in draft and final formats for review and comment. AGENCY comments <br />19 shall be noted in the final study. If specified in APPLICATION, AUTHORITY shall provide a "Before and <br />20 After Study" video of a representative portion of PROJECT at up to two (2) public meetings. <br />21 ARTICLE 5. RESPONSIBILITIES OF THE PARTICIPATING AGENCIES <br />22 PARTICIPATING AGENCIES agree to the following responsibilities for Implementation and <br />23 funding of PROJECT: <br />24 A. Provide a technical representative to meet and participate as a member of the <br />25 PROJECT's Traffic Forum. <br />26 / <br />L1Camm1CLERl CALiW ORDPROCWGREE WGB1 B�.docx Page 6 of 15 <br />251-14 <br />
The URL can be used to link to this page
Your browser does not support the video tag.