Laserfiche WebLink
COOPERATIVE AGREEMENT NO. C-8-1800 <br />MAIN STREET — RTSSP <br />1 B. To authorize the AUTHORITY to manage, procure, and Implement all aspects of <br />2 PROJECT. <br />3 C. To participate and support PROJECT Implementation within the timeframe outlined in <br />4 APPLICATION and consistent with the CTFP Guidelines adopted by AUTHORITY. <br />5 D. To provide AUTHORITY all. current intersection as -built drawings, all current <br />6 Intersections controller assembly plans as provided by the manufacturer and modified by Party since <br />7 original Installation, local field master, local controller, and ATMS timing plans and other ITS related <br />8 data upon request. <br />9 E. To provide the local cash match and/or documentation for the in-kind services match <br />10 for PROJECT in accordance with Attachment A. Failure to provide local cash match and or evidence <br />11 of in-kind services match may result in the loss of future participation for competitive funding <br />12 opportunities. <br />13 F. PARTICIPATING AGENCIES that have included a dollar match as identified in <br />14 Attachment A shall provide payment for the dollar match to AUTHORITY within thirty (30) calendar <br />15 days of receipt of an invoice. <br />16 G. PARTICIPATING AGENCIES that have Included an in-kind services match as identified <br />17 in Attachment A shall provide documentation of conformance as part of the semi-annual review process. <br />18 H. To waive all fees associated with any local agency permits that may be required of the <br />19 consultant, sub consultants, and/or service or equipment providers in the performance of the PROJECT. <br />20 I. PARTICIPATING AGENCIES shall provide updates on PROJECT to AUTHORITY as <br />21 part of semi-annual review process until completion of the three-year PROJECT grant period. Documents <br />22 to be provided include, but are not limited to, payroll records, contracts, and purchase orders. <br />23 J. PARTICIPATING AGENCIES shall, if specified in APPLICATION, continue Ongoing <br />24 Operations and Maintenance after the three-year grant period is complete and continue until the end of <br />25 the PROJECT per additional maintenance of effort in APPLICATION. <br />26 / <br />Page 7 of 15 <br />L:kCamm\CLERICAL\WORDPROCWGREEW G81800.docx <br />251-15 <br />