My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-081 - Environmental Review No. 2016-156
Clerk
>
Resolutions
>
CITY COUNCIL
>
2011 -
>
2018
>
2018-081 - Environmental Review No. 2016-156
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/30/2019 9:47:57 AM
Creation date
11/29/2018 10:50:06 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Resolution
Doc #
2018-081
Date
11/20/2018
Destruction Year
P
Document Relationships
NS-2960
(Amended By)
Path:
\Ordinances\2011 - 2020 (NS-2813 - NS-3000)\2018 (NS-2935 - NS-2962)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mitigation Monitoring and Reporting Program <br />Impacts Required Mitigation Measures Implementation <br />VIII. Hazards and Hazazdous Materials <br />Items (a), (b), and (c) <br />Due to the age of the existing building there is a Potential <br />OLWHAZ-IAsbestos Abatement Prior to any <br />Implementing Entity: Project applicant/ <br />that asbestos containing materials (ACM) and, perhaps, lead- <br />demolition, a thorough asbestos survey is required in <br />developer and Certified Asbestos Consultant <br />base paint (LBI) may be present Exposure to either ACM or <br />accordance with the EPA and SCAQMD Rule 403. All <br />MonitoringAgency: Ci of Santa Ana <br />g <br />LBP may expose construction colonels and people in the <br />onsite structmes that contain asbestos must have the ACM <br />�' <br />a <br />Planning and Building Agency (Building <br />vicinity of the project site to potential health risks. <br />removed according to proper abatement procedures <br />Safety Division) and the South Coast Air <br />recommended by the asbestos consultant and as required <br />Quality Management Distract (SCAQMD) <br />by the SCAQMD. All abatement activities shall be in <br />compliance with Califomia and Federal OSHA, and with <br />Timing: Prior to demolition phase <br />the SCAQMD requirements. Only asbestos trained and <br />certified abatement personnel shall be allowed to perform <br />asbestos abatement. All ACM removed from onsite <br />structmes shall be transported by a licensed to handle <br />ACM and disposed of at a licensed receiving facility and <br />under proper manifest Following completion of the <br />asbestos abatement, the asbestos consultant shall provide a <br />report documenting the abatement procedures used, the <br />volume of ACM removed, where the material was <br />disposed. This report shall include transportation and <br />disposal manifests or dump tickets. The abatement report <br />shall be prepared for the propetty owner or other <br />responsible patty, with a copy submitted to the SCAQMD <br />and the City of Santa Ana. <br />MITIGATION MONITORING AND REPORTING PROGRAM <br />4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.