Laserfiche WebLink
Mitigation Monitoring and Reporting Program <br />VIII. Hazards and Hazardous Materials Cone <br />Due to the age of the existing building there is a potential <br />3LWHAZ-2Asbestos Notification. SCAQMD Rule <br />Implementing Entity: Project applicant/ <br />that asbestos containing materials (ACM) and, perhaps, lead- <br />1403 establishes notification and work practice <br />developer and City of Santa Ana Planning <br />base paint (LBP) may be present Exposure to either ACM or <br />requirements to limit asbestos emissions from building <br />and Building Agency (Building Safety <br />LBP may expose construction workels and people in the <br />demolition and renovation activities. State law requires <br />Division) <br />vicinity of the project site to potential health risks. <br />that a copy of the asbestos demolition notification form be <br />MonitoringAgency: Ci of Santa Ana <br />g �' <br />provided to Building and Safety petsonnel pilot to the <br />Planning and Building Agency (Building <br />issuance of a demolition permit. Local governments ate <br />Safety Division)Maage and the South Alt <br />responsible for the asbestos notification process. <br />CAORCoast <br />Quality Management District (SCAQMD) <br />Timing: Pilot to and during demolition/ <br />construction phase <br />3D1HAZ-3Lead Based PaiotRemoval Pilot to the <br />Implementing Entity: Project <br />issuance of a permit for demolition of any struchse, a <br />applicant/developer and licensed Lead Based <br />licensed LBP professional shall be contracted to evaluate <br />Paint consultant <br />the structure for LBP. If LBP is discovered, it shall be <br />Monitoring Agency: City of Santa Ana <br />removed according to pmpet abatement pmcedutes <br />Planning and Building Agency (Building <br />recommended by the consultant and in accordance with <br />Safety Division) and the South Coast Alt <br />SCAQMD, State of California and Federal requitements. <br />Quality Management Distt:ct (SCAQMD) <br />Only LBP trained and certified abatement pensonnel shall <br />be allowed to petfotrn abatement activities. All LBP <br />Timing: Pilot to and during demolition <br />removed from these struchses shall be hauled and <br />phase <br />disposed of by a transportation company licensed to <br />transport this type of material. In addition, the material <br />shall be taken to a landfill of receiving facility licensed to <br />accept the waste. Following completion of the LBP <br />abatement, the LBP consultant shall provide a report <br />documenting the abatement procedutes used, the volume <br />of LBP removed, where the material was moved to, and <br />include transportation and disposal manifests of dump <br />tickets. The abatement teport shall be prepated for the <br />property owner of othet responsible patty, with a copy <br />submitted to the SCAQMD and the City of Santa Ana <br />MITIGATION MONITORING AND REPORTING PROGRAM <br />5 <br />