Laserfiche WebLink
�OLTAIC <br />um.. Y..� a.. D nMwu.iwne w. <br />Project #: 81.2078-D.1 <br />1.310 N. Birch Street <br />Location: 310 N. Birch Street <br />Santa Ana, CA 92701 <br />NJPAM 051017 -CPI <br />CHARGING UNIT MOUNTINGTYPE(s): BOLLARD <br />TOTAL# OF PARKING FOR EV: Two (2) <br />Price Breakdown: <br />Electrical/Construction, Labor and Material <br />EVCS Unit(s) and Service(s) <br />Total Price: <br />Electrical/Construction. Labor and Material Includes: <br />$9,601.00 <br />$7,409.00 <br />$17,010.00 (tax included) <br />• Proposal consists of project management and site planning, engineering and designing for any necessary <br />permit acqulsltlons. <br />o Permit acquisitions also include the plan checking, and inspection processes (not including <br />actual plan check fee, permitting and/or inspection fees) as required by the authorities having <br />jurisdiction. <br />• Perform Site Validation survey (SVS) as required by ChargePoint, Inc. prior to activation of units. SVS fee <br />to ChargePoint, Inc. discounted when using ChargePoint, Inc. Certified Installers. <br />o Standard electrical power consistency evaluation: circuit breaker and electrical panel evaluation. <br />o Cellular network communications test: test for consistency of cellular signal strength, <br />o Charging station evaluation: consistent voltage, amperage, ground, network communication. <br />ELECTRICAL EQUIPMENT UPGRADE <br />• None. <br />o Use two (2) available spaces in existing electrical panel "L" <br />-3- <br />.-,gra .-_a..r..+ra, ».ix�crr*- <br />Video Voice Data Communications I Voltaic Division 112681 Pala Drive, Garden Grove, CA 92841 Print Date: November 15, 2018 <br />,; 25E-10 <br />