My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
25E - AGMT EV CHARGING STATION
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2018
>
12/18/2018
>
25E - AGMT EV CHARGING STATION
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/13/2018 8:31:38 PM
Creation date
12/13/2018 8:27:10 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Finance & Management Services
Item #
25E
Date
12/18/2018
Destruction Year
2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
VOOLTAIC <br />• eF"atc" e. <br />WmWmc¢Fan C�w+uniennec� <br />CHARGING UNIT INSTALLATION <br />Project 81.2078-D.1 <br />• Installation and commissioning of one (1) CT4000 dual -port charging station with Power Management <br />enabled. <br />o Power Management (Power -Sharing) is featured software which allows one (1) dual -port <br />charging station to only require one dedicated circuit for both charging ports. This feature is <br />most beneficial for locations with limited electrical capacity as It allows the charging station to <br />divide charging capacity of one (1) circuit and dispense charge to two vehicles simultaneous. <br />While only a single vehicle is charging, the charging station will dispense charge at the maximum <br />possible output, <br />• Supply and Installation of one (1) 40A circuit breakers for SVCS overcurrent protection. <br />o Utilization of existing electrical panels to supply one (1) 30A circuit to new charging unit. <br />o From the electrical panel(s) to new charging stations, the new electrical conductors: #6 and #10 <br />ground wires, <br />PROVISIONS FOR FUTURE GROWTH <br />• None <br />PARKING MODIFICATIONS <br />• Supply and installation of two (2) protective bollards. <br />• Supply and mounting of two (2) EV parking signs. <br />• Stenciling/marking "EV CHARGING ONLY" for two (2) EV parking spaces. <br />RELATED CONSTRUCTION WORK <br />• Core drilling. <br />• Placement of EMT, approximately+180'. <br />INITIALS DATE <br />-4_ <br />Video Voice Data Communications I Voltaic Division 112681 Pala Drive, Garden Grove, CA 92841 Print Date: November 15, 2013 <br />25E-11 <br />
The URL can be used to link to this page
Your browser does not support the video tag.