Laserfiche WebLink
'4LTA IC <br />IDM 01 <br />Vm[v Vome Dnn DeNNuxluTVNI <br />Project 4: 81-2070-D.1 <br />2.420 N. Main Street <br />Location: 420 N. Main Street <br />Santa Ana, CA 92701 <br />NJPA #: 051017 -CPI <br />CHARGING UNIT MOUNTINGT'PE(s): WALL <br />TOTAL# OF PARKING FOR EV: Two (2) <br />Price Breakdown: <br />Electrical/Construction, Labor and Material <br />EVCS Unit(s) and Service(s) <br />Total Price: <br />Electrical/Construction. Labor and Material Includes: <br />$10,213.00 <br />$6,848.00 <br />$17,061.00 (tax included) <br />• Proposal consists of project management and site planning, engineering and designing for any necessary <br />permit acquisitions. <br />o Permit acquisitions also include the plan checking, and Inspection processes (not Including <br />actual plan check fee, permitting and/or inspection fees) as required by the authorities having <br />jurisdiction, <br />• Perform Site Validation survey (SVS) as required by ChargePoint, Inc. prior to activation of units. SVS fee <br />to ChargePoint, Inc. discounted when using ChargePoint, Inc. Certified Installers. <br />o Standard electrical power consistency evaluation: circuit breaker and electrical panel evaluation. <br />o Cellular network communications test: test for consistency of cellular signal strength. <br />o Charging station evaluation: consistent voltage, amperage, ground, network communication. <br />ELECTRICAL EQUIPMENT UPGRADE <br />• None. <br />o Use two (2) available spaces in existing electrical panel "P1" <br />-6- <br />`T.�4?�^N^' <br />Video Voice Data Communications I Voltaic Division 112681 Pala Drive, Garden Grove, CA 92841 Print Date'. November 15, 2018 <br />25E-13 <br />