Laserfiche WebLink
�V�Z)LTA IC <br />.om ,a�or <br />W co vmee uo. cex.uxamexs <br />Project #: 81.207&D.1 <br />CHARGING UNIT INSTALLATION <br />Installation and commissioning of one (1) CT4000 dual -port charging station with Power Management <br />enabled. <br />o Power Management (Power -Sharing) Is featured software which allows one (1) dual -port <br />charging station to only require one dedicated circuit for both charging ports. This feature Is <br />most beneficial for locations with limited electrical capacity as it allows the charging station to <br />divide charging capacity of one (1) circuit and dispense charge to two vehicles simultaneous. <br />While only a single vehicle is charging, the charging station will dispense charge at the maximum <br />possible output. <br />Supply and installation of one (1) 40A circuit breakers for EVCS overcurrent protection. <br />o Utilization of existing electrical panels to supply one (1) 30A circuit to new charging unit. <br />o From the electrical panel(s) to new charging station, the new electrical conductors: #8 and #10 <br />ground wires. <br />PROVISIONS FOR FUTURE GROWTH <br />• None <br />PARKING MODIFICATIONS <br />• Supply and installation of two (2) protective bollards. <br />• Supply and mounting of two (2) EV parking signs. <br />• Stenciling/marking "EV CHARGING ONLY" for two (2) EV parking spaces. <br />RELATED CONSTRUCTION WORT( <br />• Core drilling. <br />• Placement of EMT, approximately+140'. <br />INRIAIS DATE <br />-7- <br />e'a;.�� <br />Video Voice Data Communications I Voltaic Division 1 12681 Pala Drive, Garden Grove, CA 92841 Print Date November 15, 2018 <br />25E-14 . <br />