My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
25E - AGMT EV CHARGING STATION
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2018
>
12/18/2018
>
25E - AGMT EV CHARGING STATION
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/13/2018 8:31:38 PM
Creation date
12/13/2018 8:27:10 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Finance & Management Services
Item #
25E
Date
12/18/2018
Destruction Year
2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
OLTA IC <br />Nnee vome pi�cex uxm.nvx. <br />Location: 300 E. 51h Street <br />Santa Ana, CA 92701 <br />#JPA #: 051017 -CPI <br />CHARGING UNIT MOUNTING TYPE(s): <br />TOTAL# OF PARKING FOR EV: <br />Price Breakdown: <br />3.300 E. 5th Street <br />WALL <br />WEsr- Two (2) 1 EAST—Two (2) <br />Project 4: 81.2078-D.1 <br />Electrical/Construction, Labor and Material $31,402.00 <br />EVCS Unit(s) and Service(s) $13,587.00 <br />Total Price: $44,989.00 (tax Included) <br />Electrical/Construction. Labor and Material Includes: <br />Proposal consists of project management and site planning, engineering and designing for any necessary <br />permit acquisitions. <br />o Permit acquisitions also Include the plan checking, and inspection processes (not including <br />actual plan check fee, permitting and/or Inspection fees) as required by the authorities having <br />Jurisdiction. <br />Perform Site Validation survey (SVS) as required by ChargePoint, Inc, prior to activation of units. SVS fee <br />to ChargePoint, Inc. discounted when using ChargePoint, Inc. Certified Installers. <br />o Standard electrical power consistency evaluation: circuit breaker and electrical panel evaluation. <br />o Cellular network communications test: test for consistency of cellular signal strength. <br />o Charging station evaluation: consistent voltage, amperage, ground, network communication. <br />ELECTRICAL EQUIPMENT UPGRADE <br />Supply and installation of 45KVA transformer on new concrete pad to meet NEC requirements, building <br />department requirements, and if enforced, by building department, <br />o New 70A circuit breaker to provide overcurrent protection to transformer. New conductors in <br />new EMT sized per NEC requirements. <br />Supply and installation of new 125A electrical panel for EV charging stations. Materials and installation <br />to meet NEC, building department requirements, and if enforced, by building department. <br />.9- <br />vC9 <br />Video Voice Data Communications I Voltaic Division 112681 Pala Drive, Garden Grove, CAA 928?841 pi in[ Date. November 15, 2018 <br />25E-16 <br />
The URL can be used to link to this page
Your browser does not support the video tag.