My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
25E - AGMT EV CHARGING STATION
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2018
>
12/18/2018
>
25E - AGMT EV CHARGING STATION
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/13/2018 8:31:38 PM
Creation date
12/13/2018 8:27:10 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Finance & Management Services
Item #
25E
Date
12/18/2018
Destruction Year
2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
��OLTAIC <br />Ne¢¢Vm¢sEm E",wux�unvx¢ <br />CHARGING UNIT INSTALLATION <br />Project#: 81-2078-D.1 <br />• Installation and commissioning of two (2) charging unit to meet NEC requirements, <br />• Supply and Installation of four (4) 40A circuit breakers for SVCS overcurrent protection. <br />o Utilization of new electrical panel to supply four (4) 30A circuit to new charging unit. <br />o From the electrical panel(s) to new charging station, the new electrical conductors: #6, #8 and <br />#10 ground wires. <br />PROVISIONS FOR FUTURE GROWTH <br />• None <br />PARKING MODIFICATIONS <br />• Supply and installation of two (2) protective bollards per unit (total of four). <br />• Supply and mounting of four (4) EV parking signs. <br />• Stenciling/marking "EV CHARGING ONLY" for four (4) EV parking spaces. <br />RELATED CONSTRUCTION WORK <br />• Core drilling. <br />• Placement of EMT, approximately+150'. <br />INITIALS DATE <br />10- <br />. <br />0 - <br />Video Voice Data Communications I Voltaic Division 112681 Pala Drive, Garden Grove, CA 92841 Print nate: November 15, 2018 <br />25E-17 <br />
The URL can be used to link to this page
Your browser does not support the video tag.