Laserfiche WebLink
��OLTAIC <br />Ne¢¢Vm¢sEm E",wux�unvx¢ <br />CHARGING UNIT INSTALLATION <br />Project#: 81-2078-D.1 <br />• Installation and commissioning of two (2) charging unit to meet NEC requirements, <br />• Supply and Installation of four (4) 40A circuit breakers for SVCS overcurrent protection. <br />o Utilization of new electrical panel to supply four (4) 30A circuit to new charging unit. <br />o From the electrical panel(s) to new charging station, the new electrical conductors: #6, #8 and <br />#10 ground wires. <br />PROVISIONS FOR FUTURE GROWTH <br />• None <br />PARKING MODIFICATIONS <br />• Supply and installation of two (2) protective bollards per unit (total of four). <br />• Supply and mounting of four (4) EV parking signs. <br />• Stenciling/marking "EV CHARGING ONLY" for four (4) EV parking spaces. <br />RELATED CONSTRUCTION WORK <br />• Core drilling. <br />• Placement of EMT, approximately+150'. <br />INITIALS DATE <br />10- <br />. <br />0 - <br />Video Voice Data Communications I Voltaic Division 112681 Pala Drive, Garden Grove, CA 92841 Print nate: November 15, 2018 <br />25E-17 <br />