My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ORANGE COUNTY TRANSPORTATION AUTHORITY (5)
Clerk
>
Contracts / Agreements
>
O
>
ORANGE COUNTY TRANSPORTATION AUTHORITY (OCTA)
>
ORANGE COUNTY TRANSPORTATION AUTHORITY (5)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/14/2019 1:02:26 PM
Creation date
1/14/2019 12:59:58 PM
Metadata
Fields
Template:
Contracts
Company Name
ORANGE COUNTY TRANSPORTATION AUTHORITY
Contract #
A-2018-267
Agency
PUBLIC WORKS
Council Approval Date
11/20/2018
Expiration Date
12/31/2023
Destruction Year
0
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
COOPERATIVE AGREEMENT NO. C-8-1800 <br />MAIN STREET — RTSSP <br />1 ARTICLE 4. RESPONSIBILITIES OF THE AUTHORITY AS PROJECT LEAD AGENCY <br />2 The AUTHORITY as the LEAD AGENCY agrees to the following responsibilities for the <br />3 implementation of the PROJECT: <br />4 A. AUTHORITY shall act as the LEAD AGENCY for the work necessary to manage, procure, <br />5 and complete the PROJECT as identified in APPLICATION. <br />6 B. To coordinate outreach with PARTICIPATING AGENCIES for PROJECT. <br />7 C. To collect all data necessary to provide new optimized timing plans including, but not <br />8 limited to, manual or video all movement counts at each PROJECT signalized intersection, and a mutually <br />9 agreed upon number and location of twenty-four (24) hour / seven (7) day automated machine traffic <br />10 counts with vehicle classification. <br />11 D. To develop and implement new timing plans optimized for signal synchronization. <br />12 E. To provide updated timing plans for all control systems and all relevant data used to <br />13 develop said plans to PARTICIPATING AGENCIES. <br />14 F. To prepare a "Before and After Study" for PROJECT as described in the Measure M2 <br />15 Eligibility Guidelines adopted by the AUTHORITY. The "Before and After Study" for the project is <br />16 considered the equivalent of the required Project Final Report (Measure M2 Ordinance No. 3, Section <br />17 8.111.9) for PROJECT. The AUTHORITY shall provide the "Before and After Study" to the <br />18 PARTICIPATING AGENCIES in draft and final formats for review and comment. AGENCY comments <br />19 shall be noted in the final study, If specified in APPLICATION, AUTHORITY shall provide a "Before and <br />20 After Study" video of a representative portion of PROJECT at up to two (2) public meetings. <br />21 ARTICLE 5. RESPONSIBILITIES OF THE PARTICIPATING AGENCIES <br />22 PARTICIPATING AGENCIES agree to the following responsibilities for implementation and <br />23 funding of PROJECT: <br />24 A. Provide a technical representative to meet and participate as a member of the <br />25 PROJECT's Traffic Forum, <br />26 1 <br />Page 6 of 15 <br />L:\Camm\CLERICALIWORDPROCVAGREeAG81800.docx <br />
The URL can be used to link to this page
Your browser does not support the video tag.