My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
75E - PH 2525 MAIN ST
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2019
>
02/05/2019
>
75E - PH 2525 MAIN ST
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/1/2019 4:04:49 PM
Creation date
2/1/2019 3:58:07 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Planning & Building
Item #
75E
Date
2/5/2019
Destruction Year
2024
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
378
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EIR No. 2018-01, DA No. 2018-01, GPA No. 2018-06, <br />AA No. 2018-10 2525 North Main Street <br />February 5, 2019 <br />Page 11 <br />property would be developed at a higher density than the nearby single-family residential uses. <br />However, multi -family uses are often used in planning and zoning practice to buffer higher intensity <br />uses like commercial or industrial uses from single-family residential uses and multi -family and <br />single-family uses are more compatible in nature to each other. <br />The Specific Development No. 93 (SD -93) is established for the purpose of protecting and <br />promoting the public health, safety and general welfare of the City and its residents. This new <br />zoning designation for the site is crafted to be consistent with the proposed project. If the zone <br />change is approved, a series of site-specific objectives, policies and development standards will <br />be used to guide the development of the project. Specifically, the SD -93 document includes a <br />menu of development standards which specify setbacks, parking, height and landscape <br />requirements and includes provisions for construction and maintenance to allow the exclusive <br />entitlement of the residential project. The SD -93 document has been framed to include staff <br />recommended changes to the project and prohibits future modifications to enlarge the size of the <br />project. Approval of the proposal would allow for the construction of a high-density residential <br />development in an urbanized setting that is within close proximity to neighborhood services and <br />amenities. <br />If approved, the zone change would need to be approved in conjunction with the proposed general <br />plan amendment. This would result in a project that is consistent with the goals and objectives of <br />City's General Plan land use designation of District Center. The project will promote an urban <br />development where office, retail and residential activities would coexist in close proximity and in a <br />mixed-use setting. Further, the project will contribute towards the improvement of the character of <br />the northern section of the City. Finally, the development, through the construction of the proposed <br />public improvements and site amenities, will contribute to the enhancement of the area and serve <br />as a buffer between commercial and high intensity uses and the lower density residential area. <br />Public Comments <br />A significant number of public comments have been received on this project, mainly voicing <br />concerns with or opposition to the project. Over the last year emails (approximately 400 emails are <br />on file), letters and phone calls were received, and small group meetings and study sessions have <br />been conducted. A list of the major comments received are summarized in the sections below. <br />Community Meetings <br />On November 15, 2017, 27 calendar days after the application was submitted, the developer held a <br />Sunshine Meeting at the Discovery Cube of Orange County and overviewed plans for a 517 -unit <br />development, 5 -stories in height, with 910 parking spaces and access from Edgewood Road. Sign - <br />in sheets indicate 263 people attended. Minutes of the meeting including community comments <br />made at the meeting and the applicant's responses were prepared by the applicant (Exhibit 6). <br />In early 2018 (January 30, 2018 and February 15, 2018), planning staff coordinated meetings with <br />the developer and the North Santa Ana Preservation Alliance representatives. Approximately 20 <br />people attended the small group meetings, including the developer, members of the North Santa <br />75E-11 <br />
The URL can be used to link to this page
Your browser does not support the video tag.