My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
75E - PH 2525 MAIN ST
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2019
>
02/05/2019
>
75E - PH 2525 MAIN ST
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/1/2019 4:04:49 PM
Creation date
2/1/2019 3:58:07 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Planning & Building
Item #
75E
Date
2/5/2019
Destruction Year
2024
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
378
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EIR No. 2018-01, DA No. 2018-01, GPA No. 2018-06, <br />AA No. 2018-10 2525 North Main Street <br />February 5, 2019 <br />Page 20 <br />In 2020, the project and cumulative projects are anticipated to generate 4,306 a.m. peak hour trips, <br />4,359 p.m. peak hour trips, and 49,842 daily trips. In 2020, with the cumulative project trips, all <br />study area intersections are forecast to operate at satisfactory levels of service, except for the Main <br />Street/Santa Clara/I-5 northbound on ramp and the SR -22 eastbound ramps at Town and Country <br />Road in both the a.m. and p.m. peak hours. However, the SR -22 eastbound ramps at Town and <br />Country Road also operate at unsatisfactory conditions under existing conditions. In 2040, the <br />intersections are anticipated to operate at an unsatisfactory level of service with or without the <br />project. <br />Impacts to Public Services <br />Section 4.10 of the Draft EIR analyzed the impacts of the project on fire service, police service and <br />parks and recreation service. CEQA focuses on the physical effects of the project (i.e. new or <br />expanded facilities), therefore an increase in staffing or calls for service would not, by itself, be <br />considered a physical change in the environment. As proposed the project would result in a less <br />than significant impact to public services. <br />Impacts to Utilities <br />Sections 4.13 and 4.14 of the Draft EIR analyzed the impacts of the project on water supply, <br />wastewater, drainage, water quality, and energy. Technical reports including a Water Supply <br />Assessment, Sewer Analysis and Hydrology Report were prepared for the project. As proposed <br />the project would result in a less than significant impact to utilities and services. <br />Noise <br />Section 4.8 of the Draft EIR analyzed noise impacts related to construction operations and <br />operational noise from HVAC equipment, parking facilities, trash removal and use of the outdoor <br />open space. Based on the SAMC noise standards the project would not general noise levels that <br />would exceed noise standards. To mitigate construction noise two mitigation measures are <br />proposed, one to require a 50 -foot buffer along the east property line for large mobile construction <br />equipment and installation of a temporary noise barrier such as vinyl acoustic curtains or quilted <br />blankets attached to the east property line wall or temporary fence posts. <br />Privacy <br />Privacy concerns regarding windows on the east elevation and visibility from the rooftop amenity <br />deck into backyards or homes were raised. A rendering of eastern views from the rooftop has been <br />provided, views of the single-family dwellings are out of the line of sight from the amenity deck as <br />it is located closer to Main Street. In addition, staff has included a requirement within the Specific <br />Development for clerestory or opaque windows along the building wall that is at the 40 -foot setback. <br />75E-20 <br />
The URL can be used to link to this page
Your browser does not support the video tag.