Laserfiche WebLink
EIR No. 2018-01, DA No. 2018-01, GPA No. 2018-06, <br />AA No. 2018-10 2525 North Main Street <br />February 5, 2019 <br />Page 21 <br />Project Changes <br />Since the initial project submittal, the applicant has made changes to the project to address both <br />staffs and the public's comments. Changes made include: <br />1. Reduced the number of units from 517 to 496. <br />2. Removed access on Edgewood Road to reduce the potential for cut -through traffic into the <br />Park Santiago neighborhood. <br />3. Reduced the height of the building along the east side from 5 -stories (78 feet) to 2 -stories <br />(25 feet). <br />4. Revised the architectural style. <br />Staff is recommending additional modifications to the project based on previously constructed and <br />approved multi -family development projects in the City, planning and design principles, the <br />character of the nearby residential neighborhood, and the community's concerns. The proposed <br />changes are listed in the Development Agreement and include: <br />1. Number of units: Further reduce the number units from 496 to 476 units (81 dwelling units <br />per acre). <br />2. Unit Mix: Increase number of family units from 20 percent to 30 percent (two- and three- <br />bedroom units). <br />3. Parking Management: Increase number of spaces or capacity to increase the onsite ratio <br />of onsite parking to an equivalent of 2.00 spaces per unit. Further, a parking management <br />plan shall be submitted that maintains this ratio prior to Certificate of Occupancy and <br />throughout the life of the project. Provisions to meet this standard may include an onsite <br />valet parking service. <br />4. Design: Incorporate two courtyards into the portion of the project that is located along the <br />north property line adjacent to Santiago Park. <br />The staff recommended changes to the development discussed above will be codified in the <br />Specific Development as follows: <br />75E-21 <br />