My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
75E - PH 2525 MAIN ST
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2019
>
02/05/2019
>
75E - PH 2525 MAIN ST
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/1/2019 4:04:49 PM
Creation date
2/1/2019 3:58:07 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Planning & Building
Item #
75E
Date
2/5/2019
Destruction Year
2024
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
378
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EIR No. 2018-01, DA No. 2018-01, GPA No. 2018-06, <br />AA No. 2018-10 2525 North Main Street <br />February 5, 2019 <br />Page 4 <br />Table 2: Applicant Proposed Unit Mix and Unit Square Footage <br />Unit -Type <br />Number of Units <br />(%) , <br />Square Footage of Units <br />Studios <br />73 <br />15% <br />592-740 <br />One -Bedrooms <br />307 <br />62% <br />634-1,091 <br />Two -Bedrooms <br />88 <br />18% <br />909-1,472 <br />Three -Bedrooms <br />28 <br />5% <br />1,360 - 1,520 <br />Total <br />496 units <br />100% <br />114 <br />The main entry for the project would be via a driveway on Main Street. The driveway will lead to <br />an internal drop-off area, the leasing office and guest parking spaces before leading into the gated <br />parking structure. The parking structure is located closer to Main Street, further away from the <br />single-family homes to the east, with the residential buildings wrapped around the structure to <br />screen from views at the ground level. Two levels of the parking structure would extend above the <br />residential portion of the building. <br />The applicant is proposing to provide a secondary access/egress point at the Santiago Park <br />Drive/Walkie Way and Main Street intersection. This option is not a required element of the project <br />but would allow for an additional point of access to the development. If constructed, use of the <br />park for vehicular access would require the replacement of lost park square footage with new park <br />land of equal or greater size, utility and value. In addition, approval would be required from the <br />Parks and Recreation Department, the State Office of Grants and Local Services and the National <br />Park Service. <br />The parking structure totals 358,630 square feet, with 8 -levels above grade and 1 -level below <br />grade. A total of 904 parking spaces are proposed on-site which is a ratio of 1.8 spaces per unit. <br />A total of 150 tandem spaces (17 percent of the overall parking spaces) will be provided. The <br />applicant has provided a parking study of similar type multi -family projects that identifies a parking <br />demand of 1.354 space per unit which would forecasts parking needs to be 672 spaces for the <br />project (Exhibit 9). Table 3 below provides a breakdown of the proposed parking for the project. <br />However, the Development Agreement requires the property owner to provide parking capacity for <br />2 spaces per unit. The spaces may be provided through lifts, tandem parking, off-site parking <br />spaces with a valet service or other alternate means. <br />Table 3: Applicant Proposed Parking <br />Unit Type, <br />Units <br />Rate <br />Stalls'Provided <br />Studios <br />73 <br />1.00 <br />73 <br />One -Bedroom <br />307 <br />1.00 <br />307 <br />Two -Bedrooms <br />88 <br />2.00 <br />176 <br />Three -Bedrooms <br />28 <br />3.00 <br />84 <br />Guest Parkin <br />496 <br />.23 <br />114 <br />Tandem Stalls <br />150 <br />Applicant's Proposed Total <br />496 <br />1.80 <br />904 spaces <br />Staffs Proposed Total <br />476 <br />2.00 <br />952 spaces <br />75E-4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.