Laserfiche WebLink
EXHIBIT A <br />required by DTSC, California Integrated Waste Management Board, RWQCB, OCFA, and the Orange <br />County Health Care Agency (OCHCA). As a result, Mitigation Measure HAZ-1 has been required to <br />reduce the potential risks related to accidental release and exposure of people and the environment to the <br />contaminated soils. <br />Due to the existence of hazardous materials within on-site soils, Mitigation Measure HAZ-1 would be <br />implemented to reduce the potential risks related to accidental release and exposure of people and the <br />environment to these hazardous materials. Mitigation Measure HAZ-1 requires that a qualified consultant <br />prepare a Soil Management Plan (SMP) to be used by construction workers to remove and dispose of the <br />areas of arsenic impacted soil. Mitigation Measure HAZ-1 requires excavation of contaminated soils be <br />completed pursuant to existing DTSC and RWQCB requirements, soils sampling ensure all contaminated <br />soils are removed, and that a certified hazardous waste hauler remove and transport all arsenic impacted <br />soil and other potentially hazardous materials per California Hazardous Waste Regulations to a landfill <br />permitted by the state to accept hazardous materials. Excavated soil containing hazardous substances <br />would be classified as a hazardous waste if they exhibit the characteristics of ignitability, corrosivity, <br />reactivity, or toxicity (CCR, Title 22, Division 4.5, Chapter 11, Article 3). The SMP would detail <br />hazardous materials excavation and disposal methods and requirements pursuant to the regulation of Title <br />8 of the California Code of Regulations (CalOSHA) and Department of Toxic Substances Control (DTSC) <br />that regulates the removal, transportation, and disposal of hazardous waste to protect human health and <br />the environment. With implementation of Mitigation Measure Haz-1 impacts related to hazards of the <br />onsite contaminated soils would be less than significant. <br />Mitigation Measure HAZ-1: Prior to issuance of a grading permit, a Soil Management Plan (SMP) shall <br />be prepared by a qualified hazardous materials consultant and shall detail procedures and protocols for <br />excavation and disposal of onsite hazardous materials, including: <br />• A certified hazardous waste hauler shall remove all potentially hazardous soils. Excavation of <br />contaminated soils shall be to the depth of approximately 0.5 feet below the existing ground surface <br />in areas identified as having arsenic impacted soils. In addition, sampling of soil shall be conducted <br />during excavation to ensure that all arsenic impacted soils are removed, and that residential <br />Environmental Screening Levels (ESLs) for residential uses are not exceeded. Excavated materials <br />shall be transported per California Hazardous Waste Regulations to a landfill permitted by the state <br />to accept hazardous materials. <br />• Any subsurface materials exposed during construction activities that appear suspect of <br />contamination, either from visual staining or suspect odors, shall require immediate cessation of <br />excavation activities. Soils suspected of contamination shall be tested for potential contamination. <br />If contamination is found to be present per the California Department of Toxic Substances Control <br />(DTSC) or Regional Water Quality Control Board (RWQCB) ESLs for residential uses, it shall be <br />transported and disposed of per California Hazardous Waste Regulations to an appropriately <br />permitted landfill. <br />• A Health and Safety Plan (HSP) shall be prepared for each contractor that addresses potential <br />safety and health hazards and includes the requirements and procedures for employee protection. <br />The HSP shall also outline proper soil handling procedures and health and safety requirements to <br />minimize worker and public exposure to hazardous materials during construction. <br />• All SMP measures shall be printed on the construction documents, contracts, and Project plans <br />prior to issuance of grading permits. <br />Resolution No. Page 14 of 71 <br />Certification of the Magnolia at the Park EIR <br />75E-52 <br />