Laserfiche WebLink
EXHIBIT A <br />GoNG Nl RPEt.CSES, INC. <br />December 1g, 2018 <br />Mr. Brian Ige, Assistant Civil Engineer <br />City of Santa Ana Public Works Agency — Water Resources Division <br />City Corporation Yard <br />220 S. Daisy Avenue, Mm85 <br />Santa Ana, CA 92703 <br />Re: Proposal for Professional Plan Check Services <br />Gong Enterprises, Ino (GEI) is pleased to provide this proposal to offer professional <br />Plan checking services for City of Santa Ana Public Works Agency — Water Resources <br />Division, <br />Based on our discussions and email correspondence, pian check would include the <br />review of main line water Improvements, water lateral sarvloes, sewer main lin® <br />improvements, and sewer laterals as they relate to various types of <br />develapment/redevelopment projects such as single family, multi -family, commercia,l <br />industrial, and subdivisions (parcel or tract maps}, <br />Related Prnlem <br />1, GEI has reviewed numerous projects that involve water and sewer improvements <br />for the City of San Clemente and San Juan Capistrano for over 29 years on a <br />consistent basis. The projects include domestic and non — domestic water lines, <br />fire lines, sewer lines, and associated appurtenances such as backflow devices, <br />Pressure regulators, Fire Department connections, fire hydrants, etc. Projects <br />include Single Family homes, duplexes, commercial buildings, industrial <br />buildings, condominiums, and tract homes, This includes new and remodel <br />projects. <br />Svnor►sis of F�tan Checking and Pian check aalroach° <br />1. Mr. Kan Gong will personally be involved In the plan check process and will <br />review and/or oversee every technical map, report, or improvement plan. Since <br />(SEI provides civil engineering services solely to municipalities, there are no <br />Professional conflicts of h the private sector. <br />2. GEI plan checking Interest <br />services include both Quality Assurance (QA) and Quality <br />Control (QC). QA is to ensure that the plans have been evaluated in a technical <br />standpoint; to be in substantial compliance with CITY codes, standards, policies, <br />and criteria. QC is to ensure the improvement plans are cross-referenced and <br />coordinated with other plans or plan sheets to ensure consistency and a well <br />thought-out project. <br />7755 Center Avenue, Suite 11 oo / Ihantington Beach, CA 92647/ Ph: (7J4)372-4959/Fax (714) 372-4968 <br />43mail: GONGENTERPRIS ,S@yA4.1pp.CoM Plan Check 1 %ousulting <br />