My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
GONG ENTERPRISES, INC.
Clerk
>
Contracts / Agreements
>
G
>
GONG ENTERPRISES, INC.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/25/2020 2:22:01 PM
Creation date
2/12/2019 12:08:24 PM
Metadata
Fields
Template:
Contracts
Company Name
GONG ENTERPRISES, INC.
Contract #
N-2019-029
Agency
PUBLIC WORKS
Expiration Date
1/21/2020
Insurance Exp Date
1/1/1900
Destruction Year
2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3. GEN philosophy of the role of consultant is to support, provide advice, and to be <br />an "extension" of In-house personnel. <br />4. GEI is easily accessible to answer questions and communicate professionally <br />with CITY staff. Emalls and Voice mails are typically returned within hours on <br />the same day upon receipt of the message. <br />5. Ken Gong Is also a licensed General Contractor-- 8 classification. The <br />combination of civil engineering and construction knowledge and over 88 years <br />of experience provides valuable insight to real world practicality and engineering <br />principles. <br />Atandards and iteria <br />All pians will be reviewed for substantial compliance with CITY format, codes, criteria, <br />standards, and typical general engineering practices. <br />A kick off meeting will be scheduled with CITY staff to familiarize GEI with expectations <br />by CITY and to discuss standards, format, and criteria that projects will require. <br />Samrala Procedures° <br />The following represents a sample of pian check procedures. (subject to change): <br />4. Client contacts GEI that a project is ready for pickup. A designated location is <br />provided Q CITY for courier service to pickup, <br />2. Client shall provide GEI (2) sets of plans and 4 copy of all research information <br />such as as builts, CITY"s atlas maps, and other information that will be required <br />to adequately plan check. <br />3. GEI will have the plans picked up and project will be logged into GEI's schedule. <br />4. Goal Is to review and complete the plan check review within 2 weeks upon <br />receipt of the plans. <br />5. GEI will review the plans to ensure compliance with CITY requirements. <br />6, GEI will write a pian check letter, <br />7. GEI will return the completed review along with the plan check letter to CITY. <br />H urI ate 3c ed la E tiv em ar 2078 -- J e 2 g <br />Classification: Hrly Rate: <br />Principal/Professional Engineer 8435.00 <br />Clerical/Administration $ 85,00 <br />Blueprints, courier service, mise Cost plus 40% <br />GEI shall invoice on a time and materials basis In accordance with the hourly rate <br />schedule presented hereon on a monthly basis. All incidentalloverhead costs that <br />Include travel, printing, telephone, photographs, and postage are included within the <br />hourly rate, <br />
The URL can be used to link to this page
Your browser does not support the video tag.