My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
KOA
Clerk
>
Contracts / Agreements
>
K
>
KOA
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2022 10:33:53 AM
Creation date
2/12/2019 2:43:39 PM
Metadata
Fields
Template:
Contracts
Company Name
KOA
Contract #
A-2019-008
Agency
PUBLIC WORKS
Council Approval Date
1/15/2019
Expiration Date
1/14/2021
Destruction Year
2026
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
57
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
KOA <br />FIRM AND TEAM EXPERIENCE <br />We are excited to team with NUVIS to provide landscape and irrigation services. NUVIS is a certified D/MBE <br />and SBE firm with a local office in Costa Mesa. NUVIS has designed numerous roundabouts and traffic circles <br />for urban environments, historical/cultural sites, and street improvement projects with bike facilities. They work <br />with landscape, hardscape alternatives, and incorporate hard -wired and solar -powered irrigation options. <br />We also welcome Guide Surveying, Inc. (Guida) who provides years of reliable and accurate surveying <br />experience to our team. Headquartered in Irvine, they are a multi -disciplined land surveying firm that has <br />provided project -based and on -call geomatics services throughout California since 1995. For bike boulevard <br />projects, it is anticipated that topographic and point surveys will be required to a minimum 100 feet from the <br />BCR of the intersection. Surveys will also assist us in meeting ADA compliance requirements. <br />Twining Inc. has successfully provided geotechnical investigation services for our bike boulevard projects. <br />Their services will range from identifying pavement sections and performing percolation testing for biofiltration <br />system treatments. <br />ORGANIZATION CHART <br />Below is KOA's organization chart. It reflects our proposed key and support staff, each person's availability to <br />the project, proposed subconsultant staff, and the lines of communication for completing the project. <br />LEGEND <br />■ KOA <br />■ NUVIS <br />■ Guide <br />■ Twining <br />= Percent Available for the Project <br />Chuck Stephan, PE (30%) Ray Wang, PE (50%) Min Zhou, PE (20%) <br />ASSISTANT PROJECT MANAGER <br />Perry A, Cardoza, PLA, Calvin Voshitake PS Amir Ghavibazoo, PHD <br />PLEA (20%) (50%) (25%) <br />Task Leader Task Leader Task Leader <br />W <br />
The URL can be used to link to this page
Your browser does not support the video tag.