Laserfiche WebLink
Appropriation Adjustment and Construction Contract Award <br />for the Mabury Park Stormwater Capture Project <br />February 19, 2019 <br />Page 2 <br />Park. Stormwater will be diverted from the storm drain system into the bioretention basin, where <br />it will infiltrate into the native soil. The project involves the excavation of an existing grass area <br />and backfilling with gravel and engineered soil; construction of parkway culvert inlets and related <br />street improvements to divert stormwater flow into the bioretention basin; landscaping; and <br />installation of a public information sign. Approximately 0.63 acre-feet of stormwater will be <br />infiltrated during an 85th percentile storm, thereby removing the associated pollutant loads from <br />Newport Bay and increasing the local groundwater supply. <br />A Notice Inviting Bids was advertised on December 10 and December 17, 2018, and bids were <br />opened on January 10, 2019. The following is a summary of the bid invitations made and the bids <br />received. <br />Contractor Participation Data <br />Santa Ana contractors receiving notices <br />27 <br />Contractors requesting bidding documents <br />42 <br />Bids received <br />8 <br />Bids received from Santa Ana contractors <br />0 <br />Bid Results Summary <br />RANK <br />BIDDER'S NAME <br />LOCATION <br />BASE BID <br />1 <br />STL Landscape, Inc. <br />Los Angeles <br />$328,160.00 <br />2 <br />Aramexx Construction <br />Claremont <br />$393,398.00 <br />3 <br />Excel Paving Co. <br />Long Beach <br />$405,405.00 <br />4 <br />C.S. Legacy Construction, Inc. <br />Ontario <br />$406,990.00 <br />5 <br />DD Systems, Inc. <br />Glendora <br />$409,753.90 <br />6 <br />Gentry General Engineering, Inc. <br />Rancho Cucamonga <br />$438,236.50 <br />7 <br />William Bonadiman <br />Riverside <br />$478,000.00 <br />8 <br />Wright Construction Engineering Corp. <br />San Marcos <br />$479,647.00 <br />A total of eight bids were received and all were deemed responsive. STL Landscape, Inc., <br />submitted the lowest responsive bid in the amount of $328,160 (Exhibit 3). Based on the bid <br />analysis and a contractor's reference check, staff recommends awarding the construction <br />contract to STL Landscape, Inc., in the amount bid (Exhibit 4). <br />Approval of this item supports the City's efforts to meet Goal # 6 — Community Facilities & <br />Infrastructure, Objective # 1 (establish and maintain a Community Investment Plan for all City <br />20Ci-2 <br />