My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
23A - PROJ - 1ST ST LIFT STATION
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2019
>
02/19/2019
>
23A - PROJ - 1ST ST LIFT STATION
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/14/2019 4:20:07 PM
Creation date
2/14/2019 4:16:45 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
23A
Date
2/19/2019
Destruction Year
2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
38
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Award Contract to Arnaz Engineering Contractors, Inc., for the <br />First Street Undercrossing Stormwater Lift Station Project <br />February 19, 2019 <br />Page 2 <br />The scope of work includes excavation and construction of a retaining wall to allow for direct <br />vehicular access to the facility, and replacement of the lift station building, pumps, equipment and <br />piping connections to the storm drain system. Once completed, the improvements will increase <br />safety while performing facility maintenance and improve system efficiency and reliability by <br />upgrading outdated pumps and equipment. <br />A Notice Inviting Bids was advertised on October 2 and October 9, 2018, and bids were opened <br />on November 1, 2018. The following is a summary of the bid invitations made and the bids <br />received: <br />Contractor Participation Data <br />Santa Ana contractors receiving notices <br />51 <br />Contractors requesting bidding documents <br />64 <br />Bids received <br />4 <br />Bids received from Santa Ana contractors <br />0 <br />Bid Results Summary <br />RANK <br />BIDDER'S NAME <br />LOCATION <br />BASE BID <br />1 <br />Arnaz Engineering Contractors, Inc. <br />Anaheim <br />$630,300 <br />2 <br />California Building Evaluation & <br />Construction, Inc. <br />Anaheim <br />$1,238,767 <br />3 <br />Lucas Builders, Inc. <br />La Habra <br />$1,471,160 <br />4 <br />General Consolidated Constructors, Inc. <br />Perris <br />$1,899,267 <br />A total of four bids were received and all were deemed responsive. Arnaz Engineering <br />Contractors, Inc., submitted the lowest responsive bid in the amount of $630,300 (Exhibit 2). <br />Based on the bid analysis and a contractor's reference check, staff recommends awarding the <br />construction contract to Arnaz Engineering Contractors, Inc., in the amount bid (Exhibit 3). <br />STRATEGIC PLAN ALIGNMENT <br />Approval of this item supports the City's efforts to meet Goal #6 — Community Facilities & <br />Infrastructure, Objective #1 (establish and maintain a Community Investment Plan for all City <br />assets), Strategy C (invest resources and technology to extend the service life of existing <br />infrastructure to protect the City's investment and support a high quality of life standard) and <br />Strategy G (develop and implement the City's Capital Improvement Program in coordination with <br />the Community Investment Plan). <br />23A-2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.