My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FULL PACKET_2019-04-02
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2019
>
04/02/2019
>
FULL PACKET_2019-04-02
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/29/2019 3:26:17 PM
Creation date
3/29/2019 3:24:09 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Date
4/2/2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
102
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
REQUEST FOR <br />COUNCIL ACTION <br />CITY COUNCIL MEETING DATE: <br />APRIL 2, 2019 <br />TITLE: <br />APPROVE CONSTRUCTION CONTRACT <br />AWARD IN THE AMOUNT OF $1,528,500 <br />FOR SA -5 VAULT MODIFICATIONS <br />PROJECT (PROJECT NO. 11-6413) <br />{STRATEGIC PLAN NO. 6, 1C} <br />CITY MANAGER <br />RECOMMENDED ACTION <br />CLERK OF COUNCIL USE ONLY: <br />❑ As Recommended <br />❑ As Amended <br />❑ Ordinance on 1s' Reading <br />❑ Ordinance on 2ntl Reading <br />❑ Implementing Resolution <br />❑ Set Public Hearing For <br />CONTINUED TO <br />F►W�TifT- 4-11 <br />1. Reject all bids received on November 6, 2018, for construction of the SA -5 Vault <br />Modifications Project, due to changes in the scope of work. <br />2. Award a contract to T.E. Roberts, Inc., the lowest responsible bidder, in accordance with the <br />base bid in the amount of $1,528,500, for construction of the SA -5 Vault Modifications <br />Project, for the term beginning upon execution of the contract and ending upon project <br />completion, and authorize the City Manager and the Clerk of the Council to execute the <br />contract subject to nonsubstantive changes approved by the City Manager and the City <br />Attorney. <br />3. Approve the Project Cost Analysis for a total estimated construction delivery cost of <br />$1,987,050, which includes the contract bid amount, administration, inspection and testing, <br />and an authorized contingency of $229,275. <br />DISCUSSION <br />The SA -5 vault is one of seven connections between the City and Metropolitan Water District <br />(MWD). The connection safeguards access to MWD water and ensures reliability of drinking <br />water for residents and businesses, especially should there be an emergency or if the water <br />system is interrupted. To keep this important facility operational, City crews are required to <br />routinely access the vault to maintain the valve and connection. <br />The existing SA -5 vault is located under the northbound traffic lanes on Bristol Street, just north <br />of Alton Avenue (Exhibit 1). Currently, the City crews must block a lane on Bristol Street. By <br />relocating the vault, traffic impacts during routine maintenance will be minimized. The work will <br />also allow the existing piping, valves, and equipment to be replaced, and it includes modernizing <br />site electrical and instrumentation. <br />A Notice Inviting Bids was advertised on February 8 and 9, 2019, and bids were opened on <br />February 21, 2019. The following is a summary of the bid invitations made and the bids received: <br />23A-1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.