Laserfiche WebLink
<br />LINSCOTT, LAW & GREENSPAN, engineers LLG Ref. 2-17-3881-1 <br />Tustin Avenue Retail, Santa Ana <br />N:\3800\2173881 - Tustin Avenue Retail, Santa Ana\Report\3881 - Tustin Avenue Retail, Santa Ana TIA 03-13-18.doc <br />30 <br />11.0 CONGESTION MANAGEMENT PROGRAM (CMP) COMPLIANCE ASSESSMENT <br />This analysis is consistent with the requirements and procedures outlined in the current Orange <br />County Congestion Management Program (CMP). The CMP requires that a traffic impact analysis <br />be conducted for any project generating 2,400 or more daily trips, or 1,600 or more daily trips for <br />projects that directly access the CMP Highway System (HS). Per the CMP guidelines, this number is <br />based on the desire to analyze any impacts that will be 3.0% or more of the existing CMP highway <br />system facilities’ capacity. <br />However, as noted in this focused traffic study, the proposed Project is expected to generate a net of <br />878 daily trips, and thus does not meet the criteria required for a CMP traffic analysis. Therefore, it <br />is concluded that the proposed Project will not have any significant traffic impacts on the Congestion <br />Management Program Highway System. <br /> <br /> <br />2-108