My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
A&H REFRIGERATION, INC.
Clerk
>
Contracts / Agreements
>
A
>
A&H REFRIGERATION, INC.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/24/2019 2:08:59 PM
Creation date
4/15/2019 11:47:52 AM
Metadata
Fields
Template:
Contracts
Company Name
A&H REFRIGERATION, INC.
Contract #
A-2019-051
Agency
Police
Council Approval Date
3/19/2019
Expiration Date
3/18/2020
Insurance Exp Date
8/28/2019
Destruction Year
2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
30
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
§ 1 The Contractor and Surety, jointly and severally, bind themselves, their heirs, "centers, administrators, successors <br />and assigns to the Owner for the performance of the Construction Contract, whichis incorporated herein by reference. <br />§ 2 I the Contractor performs the Construction Contract, the Surety and the Contractor shall have no obligation under <br />this Bond, except when applicable to participate in a conference as provided in Section 3. <br />§ 3 If there is no Owner Default under the Construction Contract,. the Surety's obligation under this Bond shall arise <br />after <br />.1 the Owner first provides notice to the Contractor and the Surety that the Owner is considering declaring <br />a Contractor Default. Such notice shallindicate whether the Owner is requesting a conference among <br />the Owner, Contractor and Surety to discuss the Contractor's performance. If the Owner does not <br />request a conference, the Surety may, within five (5) business days after receipt of the Owner's notice, <br />request such a conference. If the Surety timely requests a conference, the Owner shall attend. Unless <br />the Owner agrees otherwise, any conference requested under this Section 3.1 shall be held within ten <br />(10) business days of the. Surety's receipt of the Owner's notice. If the Owner, the Contractor and. the <br />Surety agree, the Contractor shall be alloyed a reasonable time to perform the Construction Contract, <br />but such an agreement shall not waive the Owner's right, if any, subsequently to declare a Contractor <br />Default; <br />2 the Owner declares a Contractor Default, terminates the Construction Contract and notifies the Surety; <br />and <br />.3 the Owner has agreed to pay the Balance of the Contract Price in accordance with the terms of the <br />Construction Contract to the Surety or to a contractor selected to perform the Construction Contract. <br />§ 4 Failure on the part of the Owner to comply with the notice requirement in Section 3A shall not constitute a failure <br />to comply with a condition precedent to the Surety's obligations, or release the Surety from its obligations, except to <br />the extent the Surety demonstrates actual prejudice. <br />§ 5 When the Owner has satisfied the conditions of Section 3, the Surety shall promptly and at the Surety's expense <br />take one of the following actions: <br />§ 5.1 Arrange for the Contractor, with the consent of the Owner, to perform and complete the Construction Contract; <br />§ 5.2 Undertake to perform and complete the Construction Contract itself, through its agents or independent <br />contractors; <br />§ 5.3 Obtain bids or negotiatedproposals from qualified contractors acceptable to the Owner for a contract for <br />performance and completion of the Construction Contract, arrange for a contract to be prepared for execution by the <br />Owner and a contractor selected with the Owner's concurrence, to be secured with performance and payment bonds <br />executed by a qualified surety equivalent to the bonds issued on the Construction Contract, and pay to the Owner the <br />amount of damages as described in Section 7 in excess of the Balance of the Contract price incurred by the Owner as <br />a result of the Contractor Default; or <br />§ 5.4 Waive its right to perform and complete, arrange for completion, or obtain a now contractor and with reasonable <br />promptness under the circumstances: <br />.1 After investigation, determine the amount for which it may be liable to the Owner and, as soon as <br />practicable after the amount is determined, make payment to the Owner; or <br />.2 Deny liability in whole or in part and notify the Owner, citing the reasons for denial. <br />§ 6 If the Surety does not proceed as provided in Section 5 with reasonable promptness, the Surety shall be deemed to <br />be in default on this Bond seven days after receipt of an additional written notice from the Owner to the Surety <br />demanding that the Surety perform its obligations under this Bond, and the Owner shall be entitled to enforce any <br />remedy available to the Owner. If the Surety proceeds as provided. in Section 5.4, and the Owner refuses the payment <br />or the Surety has denied liability, in whole or in part, without further notice the Owner shall be entitled to enforce any <br />remedy available to the Owner. <br />Inst. AIA Doeuewnt A3121e-2010. The American lnattute of Archaean. This document was aeated on OV2812012 IVM:44 under the terms of <br />AIA Documents-anDemsndu- order no. 2008408028, and is not for reals. This document Is Ilmnsed by The American Institute of Archiects for 2 <br />onedlma use only, and may not be haproduoed priar to its completion. <br />
The URL can be used to link to this page
Your browser does not support the video tag.