My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
A&H REFRIGERATION, INC.
Clerk
>
Contracts / Agreements
>
A
>
A&H REFRIGERATION, INC.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/24/2019 2:08:59 PM
Creation date
4/15/2019 11:47:52 AM
Metadata
Fields
Template:
Contracts
Company Name
A&H REFRIGERATION, INC.
Contract #
A-2019-051
Agency
Police
Council Approval Date
3/19/2019
Expiration Date
3/18/2020
Insurance Exp Date
8/28/2019
Destruction Year
2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
30
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
§ 7 If the Surety elects to act under Section 5. 1, 5.2 or 5.3, then the responsibilities of the Surety to the Owner shall not <br />be greater than those of the Contractor under the Construction Contract, and the responsibilities of the Owner to the <br />Surety shall not be greater than those of the Owner under the Construction Contract. Subject to the commitment by the <br />Owner to pay the Balance of the Contract Price, the Surety is obligated, without duplication, for <br />.1 the responsibilities of the Contractor for correction of defective work and completion of the <br />Construction Contract; <br />.2 additional legal, design professional and delay costs resulting from the Contractor's Default, and <br />resulting from the actions or failure to act of the Surety under Section 5; and <br />.3 liquidated damages, or if no liquidated damages are specified in the Construction Contract, actual <br />damages caused by delayed performance or non-performance of the Contractor. <br />§ 8 If the Surety elects to act under Section 5.1, 5.3 or 5.4, the Surety's liability is limited to the amount of this Bond.. <br />§ 9 The Surety shall not be liable to the Owner or others for obligations of the Contractor that are unrelated to the <br />Construction Contract, and the Balance of the Contract Price shall not be reduced or set off on account of any such <br />unrelated obligations. No right of action shall accrue on this Bond to any person or entity other than the Owner or its <br />heirs, executors, administrators, successors and assigns. <br />§ 10 The Surety hereby waives notice of any change, including changes of time, to the Construction Contract or to <br />related subcontracts, purchaseorders and other obligations. <br />§ 11 Any proceeding, legal or equitable, under this Bond may be instituted in any court of competent jurisdiction in <br />the location in which the work or part of the work is located and shall be instituted within two years after a declaration <br />of Contractor Default or within two years after the Contractor ceased working or within two years after the Surety <br />refuses or fails to perform its obligations under this Bond, whichever occurs first. If the provisions of this Paragraph <br />are void or prohibited by law, the minimum period of limitation available to sureties as a defense in the jurisdiction of <br />the suit shall be applicable. <br />§ 12 Notice to the Surety, the Owner or the Contractor shall be mailed or delivered to the address shownon the page <br />on which their signature appears. <br />§ 13 When this Bond has been furnished to comply with a statutory or other legalrequirement in the location where <br />the construction was to be performed, any provision in this Bond conflicting with said statutory or legal requirement <br />shall be deemed deleted herefrom and provisions conforming to such statutory or other legal requirement shall be <br />deemed incorporated herein. When so furnished, the intent is that this Bond shall be construed as a statutory bond and <br />not as a common law bond. <br />§ 14 Definitions <br />§ 14.1 Balance of the Contract Price. The total amount payable by the (honer to the Contractor under the Construction <br />Contractafter all proper adjustments have been made, including allowance to the Contractor of any amounts received <br />or to be received by the Owner in settlement of insurance or other claims for damages to which the Contractor is <br />entitled, reduced by all valid and proper payments made to or on behalf of the Contractor under the Construction <br />Contract. <br />§ 14.2 Construction Contract. The agreement between the Owner and Contractor identified on the cover page, <br />including all Contract Documents and changes made to the agreement and the Contract Documents. <br />§ 14.3 Contractor Default. Failure of the Contractor, which has not been remedied or waived, to perform or otherwise to <br />comply with a material term of the Construction Contract. <br />§ 14.4 Owner Default. Failure of the Owner, which has not been remedied or waived, to pay the Contractor as required <br />under the Construction Contract or to perform and complete or comply with the other material terms of the <br />Construction Contract. <br />§ 14.5 Contract Documents. All the documents that comprise the agreement between the Owner and Contractor. <br />§ 15 If this Bond is issued for an agreement between a Contractor and subcontractor, the term Contractor in this Bond <br />shall be deemed to be Subcontractor and the term Owner shall be deemed to be Contractor. <br />ALA nocumont A312TM-2010. The American lns@ute of Architects. This document Was created on 02@81201211:24:44 under the fence of <br />AIA pocumerds-orveemendr" order no. 2008408023, and Is not for resale. This doeument is licensed by The American Institute of Architects for 3 <br />one41me use only, and may not be reproduced prior to Its completion. <br />
The URL can be used to link to this page
Your browser does not support the video tag.