Laserfiche WebLink
Lincoln/Fairhaven Access Trail Addendum Project <br />City of Santa Ana <br />GROUP <br />The update to the Lincoln/Fairhaven Access Trail Addendum to the Santa Ana Second Main Track Project Final <br />Environmental Impact Report (2013) will include the following revisions to the Project Description: <br />• The City will not replace any walls along the residential side but will design the pathway to keep the existing walls <br />to have a minimum 6-foot height clearance from the pathways finished surface up to the top of the existing walls. <br />• The City will construct 6-foot tall welded wire mesh fence with vines along the pathways on both sides. <br />Task 2: Draft Addendum <br />Chambers Group will revise the previously prepared Lincoln/Fairhaven Access Trail Addendum to the Santa Ana Second <br />Main Track Project Final Environmental Impact Report (2013). Revisions to the Addendum will include updates to the <br />analysis, as necessary, to Incorporate the revised Project Description, Additionally, Chambers Group will revise the <br />Addendum to include the updated Appendix G of the CECtA Guidelines. Updates to Appendix G include, but are not <br />limited to, the addition of Energy and Wildfire as individual impact areas, major revisions to the transportation impact <br />area, minor revisions to geology and soils, hydrology and water quality, biological resources, and cultural resources, <br />and the movement of paleontological resources from cultural resources to geology and soils impact area. <br />Task 3: Final Addendum <br />Chambers Group will revise the Draft Addendum following receipt of one set of integrated comments on the Draft <br />Addendum from the City. Per the direction of the City, if an addendum is deemed as the appropriate CEQA document, <br />Chambers Group will prepare an Addendum Summary that highlights the proposed project components, brief <br />discussion on impacts to resource areas, and proposed mitigation measures. <br />Deliverables: One (1) electronic PDF copy of the Final Addendum; three (3) hard copies and one (1) CD containing an <br />electronic PDF copy of the Final Addendum for City use if requested. <br />Schedule <br />Chambers Group will prepare a Draft Addendum for City review within three weeks of notice to proceed. Chambers <br />Group will revise the Draft Addendum and produce a Final Addendum within two weeks of receipt of comments from <br />the City. <br />Cost <br />Task 1: Revise Project Description $800.00 <br />Task 2: Draft Addendum $2,600.00 <br />Task 3: Final Addendum $1,600.00 <br />Total $5,000.00 <br />Authorization <br />If the City of Santa Ana elects to use a purchase order or other document to commence the services or for billing or <br />accounting purposes, Chambers Group will refer to such document by number in its correspondences, invoices, and <br />work products; however, Chambers Group's Terms and Conditions will prevail over any such document, and only <br />Chambers Group's Terms and Conditions shall apply with respect to the services, superseded by a definitively written <br />contract when executed by the parties. <br />pN/~ < A 2 <br />= t CHAMBERS <br />/p�` GROUP 631z1 www.CIIamhersyrOupinC.COm <br />