Laserfiche WebLink
CITY OF SANTA ANA <br />PROPOSAL <br />PROJECT NO.: 19-6495 <br />FIRST STREET UNDERCROSSING STORMWATER LIFT STATION <br />BID PROPOSAL <br />TO: CITY COUNCIL OF THE CITY OF SANTA ANA <br />FROM: Arnaz Engineering Contractors, Inc. <br />REQUIREMENT: <br />The undersigned bidder declares that they have carefully examined the location of the proposed <br />work, that they have examined the Contract Documents in its entirety and hereby proposes to <br />furnish all material and do all the work required to complete the said work in accordance with <br />said plans and the specifications for the unit price(s) or lump sum(s) set forth in the following <br />schedule: <br />Item <br />Description <br />Quantity <br />Unit <br />Unit Price <br />Amount <br />1 <br />Design Services <br />1 <br />LS <br />$ <br />S <br />2 <br />Clearing and Grubbing <br />I <br />LS <br />$ <br />$ <br />3 <br />Masonry Retaining Wall <br />150 <br />LF <br />$ <br />$ <br />4 <br />PCC Curb & Gutter (A-2-8) <br />60 <br />LF <br />$ <br />$ <br />5 <br />PCC Curb (13-1) <br />30 <br />LF <br />$ <br />S <br />6 <br />PCC Swale (T=44") <br />900 <br />SF <br />$ <br />$ <br />7 <br />PCC Sidewalk (T=4") <br />80 <br />SF <br />$ <br />$ <br />8 <br />PCC Driveway Approach (T=8") <br />230 <br />SF <br />$ <br />$ <br />9 <br />PCC Driveway (T=8") <br />1,500 <br />SF <br />$ <br />$ <br />10 <br />PCC Catch Basin (Type `B") <br />5 <br />EA <br />$ <br />$ <br />11 <br />Remove Existing Tree <br />10 <br />EA <br />$ <br />$ <br />12 <br />Demolish Existing Stair Assembly <br />1 <br />LS <br />$ <br />$ <br />13 <br />Demolish Existing Gravity Discharge Box <br />1 <br />LS <br />$ <br />$ <br />14 <br />Demolish Existing Pipe <br />1 <br />LS <br />$ <br />$ <br />P-1 of P-16 <br />