Laserfiche WebLink
CITY OF SANTA ANA <br />PROPOSAL <br />PROJECT NO.: 19-6495 <br />FIRST STREET UNDERCROSSING STORMWATER LIFT STATION <br />Item <br />Description <br />Quantity <br />Unit <br />Unit Price <br />Amount <br />15 <br />Furnish and Install 12" Cement -Lined Cast <br />Iron Pipe <br />1 <br />LS <br />$ <br />$ <br />16 <br />Furnish and Install 3" Cement -Lined Cast <br />Iron Pipe <br />1 <br />LS <br />$ <br />$ <br />17 <br />Furnish and Install Clarifier and Pipe <br />1 <br />LS <br />$ <br />$ <br />18 <br />Furnish and Install Full -Matrix LED <br />Traffic Calming Sign System <br />1 <br />LS <br />$ <br />$ <br />19 <br />Lift Station <br />1. <br />LS <br />$ <br />$ <br />20 <br />Epoxy Coat Lift Station <br />1 <br />LS <br />$ <br />$ <br />21 <br />Traffic Control Plan <br />1 <br />LS <br />$ <br />$ <br />22 <br />Labor Agreement Oversight <br />1 <br />LS <br />$7,000 <br />$7,000 <br />TOTAL BASE BID <br />$ <br />The lowest responsible bidder shall be selected based on the total base bid. <br />TIME FOR COMPLETION OF IMPROVEMENTS AND LIQUIDATED DAMAGES <br />The undersigned bidder hereby proposes to complete the Work for the total base bid amount <br />shown above, within One Hundred Sixty (160) working days after the commencement date <br />stated in the Notice to Proceed. <br />• 60 working days for project design (Milestones: 30% design within 20 working days, <br />60% design within 40 working days, and 100% design within 60 working days) <br />• 100 working days for project construction <br />The liquidated damages amount, in lieu of the amount specified in Subsection 6-9 of the <br />Standard Specifications, shall be $1,000 per calendar day. <br />Name of Firm Arnaz Engineering Contractors, Inc. <br />Signature of BIDDER <br />/Ali Yazdanshenas <br />Title President <br />(If an individual, so state. If a firm or co -partnership, state the firm name and give the names of <br />all individual co-partners composing the firm. If a corporation, state legal name of corporation, <br />and names of President, Secretary, Treasurer and Manager, thereof.) <br />P-2 ofP-16 <br />