My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
25G - AGMT METER INFRASTRUCTURE
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2019
>
05/07/2019
>
25G - AGMT METER INFRASTRUCTURE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/2/2019 6:17:26 PM
Creation date
5/2/2019 6:03:20 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
25G
Date
5/7/2019
Destruction Year
2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
192
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Education and Certifications <br />BS Business Administration <br />Cal Polytechnic University Pomona (May <br />1985) <br />Joe Kelly <br />Deployment Manager/Meter SME �* <br />Mr. Kelly provides deployment management and metering subject <br />matter expertise for UtiliWorks. Joe has 18 years' experience in the <br />AMI/AMR field, eight of those years as the owner of a meter installation <br />company. In addition to deployment oversight, Joe provides expertise <br />in metering and network communications. <br />Relevant experiences and background include: <br />• Planning and executing water, gas and electric utility technology <br />programs <br />• Managing installation contractors in meter deployments, oversight <br />of meter inventory and project schedules and contractor <br />performance <br />• Provide network feasibility surveys prior to network deployment <br />• Assists with smart grid/ water/ gas assessments and associated <br />business cases with a clear roadmap to achieve anticipated <br />benefits <br />• Design and construction of meter test benches for use in Alpha <br />phase deployments <br />• Creating scopes of work and oversight for pre -deployment meter <br />surveys <br />• Augments utility staffing with AMI system administration during <br />and after deployment <br />Project References <br />• Alameda Municipal Power (Procurement, Alpha/Beta/Full <br />deployment oversight of Li3G AMI network) <br />• Long Beach Gas and Oil (Full deployment oversight of Sensus AMI <br />network) <br />• North Marin Water District (Procurement and metering SME for <br />Neptune AMI network) <br />• Santa Rosa Water (Procurement, Meter SME, Alpha/Beta/Full <br />Deployment oversight of Sensus AMI network) <br />• Loudon Utilities (Procurement, test bench construction, <br />Alpha/Beta/Full Deployment oversight) <br />• City of Mesa (Procurement, Full deployment oversight) <br />• Sewerage and Water Board of New Orleans (Pre -deployment <br />meter/ meter box survey oversight) <br />• City of Winston-Salem (Pre -deployment meter box survey) <br />• Buena Park Water (Procurement, Full deployment oversight) <br />• City of Roseville (Procurement, meter SME, Alpha/Beta/Full <br />Deployment oversight) <br />P!��ye3 of 6 <br />47 <br />2DMblI1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.