Laserfiche WebLink
• Review and provide feedback on vendor and utility test cases for each phase to identify <br />potential gaps and supplement accordingly <br />• Aggregate test cases provided by each vendor and the City for each phase <br />• Coordinate scheduling and execution of the testing by each vendor and the City <br />• Provide onsite testing oversight and support of the test team <br />• Establish an issue/defect tracking system, monitor defects/ problems reported by the <br />test team, facilitate assignment of problems for resolution, and ensure retest by the <br />test team <br />Assumptions: UtiliWorks will oversee Utility personnel onsite during testing and can, but will not be <br />required to, perform some testing with the City's permission and appropriate access to systems. <br />UtiliWorks will not build out detailed test scripts but will support the City in their efforts. <br />Deliverables: Integrated Test Plan (*.doc), Supplemental Test Cases (*.xls), Issue/Defect tracking <br />system (SharePoint) <br />Task 1.6 - Oversee Systems Integration <br />UtiliWorks will coordinate and oversee the systems integration effort that will occur during the <br />POC phase. The intent is to have the pre -identified systems interfaces designed, developed, <br />tested and automated prior to full deployment start. UtiliWorks will lead a kickoff integration <br />workshop with Santa Ana staff and the designated vendor(s) personnel to identify and confirm <br />the security requirements and network architecture; systems -specific integration methodology; <br />and begin the discussion on file layouts and interface requirements. <br />Following the kickoff, UtiliWorks will lead weekly technical review meetings with all designated <br />personnel internal and external to Santa Ana to monitor progress and identify roadblocks to <br />systems integration activities. <br />Assumptions: Designated SME's from Santa Ana, each Vendor, and any third -party integrator will <br />participate in the workshop(s) and the weekly status meeting <br />Deliverables: High-level systems integration diagram (*.vsd), Weekly meeting notes and <br />integration activities trackers) <br />Task 2- Business Process Re -Engineering <br />UtiliWorks will engage Santa Ana in a series of workshops, designed to guide the Utility through <br />changes to internal business processes as part of an AMI Deployment. To achieve the anticipated <br />benefits of the systems, the City will need to adopt new processes. Vendors will often skim <br />over recommendations detailing changes specific to business processes. UtiliWorks will utilize <br />the background information on the City, including goals and objectives, to help drive discussion <br />around operational changes that are the successful foundation for a Business Process Re- <br />engineering (BPR) effort. <br />This effort is also an important step for Change Management, since a wide -range of employees <br />and staff will be involved in BPR activities. In fact, this is an opportune time to get employees <br />Involved on the "ground -level." Many of the changes recognized during BPR workshops are the <br />direct result of new technology and systems that will fundamentally change the way the Utility <br />operates. As part of the BPR effort, the UtiliWorks team will work to identify redundancies in <br />The City of Santa Ana <br />P 70 9 <br />26IT <br />Page 17 <br />