My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
75A - PH SCHOOL EXPANSION
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2019
>
05/07/2019
>
75A - PH SCHOOL EXPANSION
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/2/2019 6:19:35 PM
Creation date
5/2/2019 6:04:11 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Planning & Building
Item #
75A
Date
5/7/2019
Destruction Year
2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
30
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ZOA No. 2019-01 <br />February 11, 2019 <br />Page 2 <br />Item <br />Information <br />Existing Site Development <br />Seven separate one and two-story buildings of approximately <br />195,000 square feet of floor area with 303 parking spaces. <br />Existing Uses <br />Auto related uses (auto repair and tire facilities) are located on the <br />north side of the site; Tempio Calvario Church and administrative <br />offices are at the eastern end of the site; and, small light industrial <br />uses are found at the west end of the site. <br />Use Permissions <br />Amendment to allow a school as a permitted use in SD -82 and <br />subject tooperational standards. <br />Zoning Code Sections Affected <br />Uses <br />SD -82 <br />Operational <br />SD -82 <br />Standards <br />Prosect Description <br />Vista Heritage Charter School is proposing to expand their current 6-8t' grade operation to include <br />Kindergarten through 5t' grades. To accomplish this, Vista Heritage is proposing to expand upon <br />their 18,368 square foot facility by leasing an additional 48,000 square feet of floor area adjacent to <br />their existing campus. The additional square footage will include space for 27 classrooms, multi- <br />purpose rooms, a cafeteria and restrooms. If approved, Vista Heritage will encompass <br />approximately 66,000 square feet of area for 38 classrooms, a multi-purpose room, two cafeterias, <br />office areas and conference rooms. The enlarged campus will be able to accommodate 870 total <br />students, including 420 elementary age students and 450 middle school students. The Increase in <br />grades and students is expected to occur gradually, with the buildup anticipated to take up to five <br />years to reach maximum capacity. <br />Currently, Vista Heritage operates within a two-story, 18,368 square foot space. The school has <br />11 classrooms, office areas, a cafeteria, a teachers lounge and restrooms. A total of 270 students <br />currently attend the school, although the school is licensed for up to 420 students. The school will <br />operate Monday through Friday from 7 a.m. to 6 p.m. The school currently operates from 8 a.m. to <br />3 p.m, but will shift_ their starting hours to between_ 7:30 a.m. to 8:15 a.m. to facilitate the drop-off <br />function. School will end between 3 p.m. and 3:15 p.m., with about a third of the students <br />expected to leave the campus. The remaining students will remain for after school care and will <br />exit the site between 3:15 p.m. and 6 p.m. <br />Improvements will be primarily limited to interior tenant improvements to modify the building to <br />accommodate school occupancy. Currently, Vista Heritage occupies the central bay of a three -bay <br />industrial building at 2609 West Fifth Street (identified as Bay 2 on the plans). At ultimate buildout, <br />this space will contain 11 classrooms, conference space and a cafeteria on the first floor and staff <br />areas on the second floor. The space at 2617 West Fifth Street (Bay 1), which consists of 16,077 <br />square feet of first floor area, will have a multi-purpose room, a conference room and one <br />classroom. Finally, 2601 West Fifth Street (Bay 3) will contain 11 classrooms and a cafeteria on <br />the first floor and 15 classrooms on the second floor area. An elevator will also be provided within <br />this bay to comply with ADA requirements. Minor exterior improvements will also be made to the <br />building and site. These include a new disabled path of travel, parking lot repairs and restriping, <br />75A-14 <br />
The URL can be used to link to this page
Your browser does not support the video tag.