EXHIBIT 1C
<br />Within a reasonable time prior to the start of any on -silo work, delivery of materlals, equipment, or personnel, Contractor will submit to
<br />Owner the following;
<br />A- A Complete set of drawings approved by Owner and subsequently by the City in which the Building Is loomed.
<br />B- A fully executed Imill Ity Agreement (To Be Provided by Owner Upon RequesI).
<br />C- Certlfl021ee1' Insurance Ina fort approved by Owner executed by Insurance companice acceptable to Owner.
<br />D- A lolly executed Notification -Rules for Contractors (To Be Provided by Owner Upon Request).
<br />E- A job schedule ofthe work to be accomplished, detailed by trade.
<br />P A complete list of all proposed Subcontractors and suppliers. Owner must approve all contractor and subcontractors before
<br />commencement of their work.
<br />Cl- The name and phone number (including emergency phone numbers) orpersonnei who are authorized to represent Ilia Contractor,
<br />3. No revisions or changes of any kind may be made to the construction plans previously approved by Owner without prior written consent of
<br />the Owner, Any proposed revisions or changes must be submitted to Owner In the form of a change order, for Owner's review and
<br />approval prior to commencement of such changes. Revisions or changes altering the floor plan, base building systems, or building
<br />operations must be submitted, In writing, to the Owner for review and approval prior to commencement of work,
<br />4. All of Contractor's work must be scheduled so that it in no way conflicts with, Interferes with, or impedes ilia quiet and peaceful enjoyment
<br />of other tenants or occupants of the project, or with the progress of Owner's work At operations. Any work that is in conflict will be
<br />rescheduled by the Contractor to such time as approved by Owner, Additionally, Owner shall have no liability for any costs oY expenses
<br />Incurred by Contractor (or Tenant) in connection with such rescheduling.
<br />S. Contractor and subconusctors shut] employ persons and menus for the orderly progress of the work without interruption on account of
<br />strikes, work stoppages or sind]nr causes of delay, Additionally, Owner shall have no liability for any costs or expenses Incurred by
<br />Contractor (or Tenant) in connection with such delays.
<br />6. Materials and tool storage will be limited to the areas for which access has been granted.
<br />7. Clean-up and rubbish removal shelf he provided by the Contractor at Contractor's expense. Contractor must, on o dally basis, remove all
<br />rubbish, surplus and waste material resulting from the performance of his work. At die request of Owner, Contractor shall refaces, any
<br />materials causing on obstruction as directed by Owner. Contractor will not be allowed to piece a dumpstor on site on n continuous basis
<br />during constnrctlon.
<br />Important note: The placement and Iecntion ormbleish dmnpeters and bins must be. approved in advance by Owner.
<br />8. In general, Owner will Interface with Contractor to the extent necessary for work to be completed within flue guidelines of project
<br />specifications and for the enforcement of building rules and regulations.
<br />9. Contractor will make arrangements for unloading, b•esh removal and hoisting after normal working hours due to the local city neiso
<br />ordinance. (Nu such nativity will be allowed between the hours of to:oo p.m. to 7:00 a.nQ At no time will the Contractor be gfven
<br />exclusive reserved use of the freight elevator unless applied for by Contractor and approved by Owner. Contractor may be afforded access
<br />to loading clock space and hoisting facilities fur limited use at such time during nannal working hours as is prearranged with Owner, or el
<br />other times, with the consent orOwner and upon payment of Owner's prevailing fee for after-hours use and access.
<br />10. Contractor will be nftbrded unloading areas ns prearranged with Owner. All materials unloaded at these areas will be moved to an area of
<br />use Inloediately and that not be stored or used in a way which adversely impacts use of the Building.
<br />II. Cuntraclar (and Tenant) will be responsible for the security of its own materials, equipment and work, and that of his subsoil tractors.
<br />Contractor will also be responsible for damage caused by Contractor or its subcontractors to die Project, Building end/or tenant areas,
<br />including. but not limited to the loading dock and indoor and outdoor public areas, freight elevators, etc. Any such damages will he
<br />promptly repaired to the Owner's satisfaction at soft coat ofComrautor,
<br />12. Contractor will comply with all applicable codes, laws and regulations pertaining to the work of Cont•aclur, including all solety and henhh
<br />regulntiuns. The Contractor shall supply the Owner with a Master List of all hlazarduus Materials and their Material Solety Data %heels
<br />(MSDS) upon delivery to [lie'job site. A discussion will then ensue pertaining to the safe storage, handling and use ol'Ihese materials. as
<br />well as the Cuntmctor's emergency preparedness plan far handling the containment and clean-up oftimentiol Ifnmrdoos Material spills,
<br />13. Comnrctorwill not engoge In any labor practice that may delay or otherwise Impact the workmfOwncr or any mirar wnunctnr.
<br />Id. Nu base building systems will Ire turned oIT or disengaged by Contractor or any subconlrsctor without prior written approval nod
<br />supervision by u representnlive nPOwner ur its agent. Said systems include but are not limited to sprinklers, electrical circuits, air -handling
<br />units, smuke fiends and water supply. Building electrical power shut -downs are allowed, with Ilia prior written consent orowner, an
<br />Salunla-vs between 10:00 p,nt, and 5:00 amn. only, A request for approval shall be etude to the Popery Manager at lent ten (10) days In
<br />advance.