Laserfiche WebLink
EXHIBIT 1C <br />15, Doors to all work areas, In cludingstairwells and mechanical and electrical closets, will remain closed at all time. Propping doors open is <br />expressly prohibited. <br />16. All Contractor and subcontractor personnel, materials, tools slid equipment are to enter and exit the Building ttwough the service elevator <br />only. Owner may at any time Initiate a check In/cheek out system, or a badge system, for all people and material in the Building and die <br />Contractor will agree to coopemle with any Ruch system. <br />17. Before ordering material or doing Work which is dependent upon proper size or installation, the Contractor shall field verify all dimensions <br />Air accessibility with building conditions, and shall be responsible for same, <br />18, Contractor shall not permittedenyidentifyingsignngeoradvertisingwithintheProjectorBuilding. <br />19. During construction, Contractor shall maintain supervisory persomiel on tile site at all times. Such parlance] shall be fully authorized to <br />coordinate, respond for and authorize Contractor's work as necessary so as to enable all work to proceed in a timely mid well -ordered <br />fashion, Should Contractor perform work which would cause or require Owner to provide personnel to be present or otherwise perform <br />oily work, Contractor shall reimburse Owner fertile expense of auoh personnel. <br />20, Contractor shall be responsible for the protection of hs work and the area adjacent to his work. <br />21 Contractor will ensure that all stairwells, mechanical rooms, e)ectrical and telephone Closets, ate, aooessed by Contractor or subcontractors <br />In conjunction with Contractor's work, will he cleaned slid free of debrs nightly. <br />22, Publtcareas ndjacent to premises where Contractor's work is being performed shall rennin Flee afdebris and materials atoll times. <br />23. Contractor shall be responsible for all his actions on site as well as those or its subcontractors, and shall Indemnify, defend and hold <br />harmless tine Owner end the other Owner Parties them end against any and all claims, losses, or damages, threatened or Incurred, arising <br />&am the actions or omissions of Contractor or Its subcontractors. <br />24. If keys are required by comrrictors, they must be checked out from the Property Management Office. No key will be distributed If proper <br />identification is not provided. <br />25. No cutting or patching of Owner's premises or installations, or those of any Building occupant, shalt be permitted witaaut the prior written <br />consent of Owner. Request for permission to do cutting shall Include explicit details and description of wank and snail not under ally <br />circumstances diminish die structural integrity of the Building or due Integrity of ally of components or systems. Ilia work is to be done <br />only with the explicit written permission of 016 Property Manager, and only on an "Orf-liuurs" basis. Such work is to be done only under <br />the direct supervision of a competent member of the Contractor staff. Any such area is to be promptly repelled and returned to a fully <br />functioning, complete, and clean condition, <br />26, All work is to be done to a minimum standard or quality as required by the Base Building Drawings and Specifications (to be made <br />available by Owner uponxequa5t). It is the responsibility or die Conbocto• to be fully knowledgeable orthe Base Building Drawings and <br />Specifications. <br />27. All Life Safety Systems for the Building are to be maintained, and all of ilia Tenant's work is to he properly interfaced with slid connected <br />to the Base Building systems as required by Laws, or by Building operation. All work Is to be done in such a way as to protect all Base <br />Building operations and warranties. Any required disconnection of life safety devices should be TOref en" end the Property Management <br />Office must be notified at least 24 hours in advance. Costa for false fire elates due to contractors' or subcontractors' negligence will be <br />billed to and paid by the Contractor. All It re -safety systems testing must be performed on an "after-hours" basis and coordinated with die <br />Building Manager. <br />23, When wok is performed by Contractor or subcontractor, charges will apply for additional services performed by Owner which may <br />Include, but are not necessoily limited to die following: <br />overtime or after-hours elevator usage <br />B. utility usage for construction activities beyond standard power And water used in connection with general office uses <br />extra and continuous calln•op of elevamrs and public spaces as required due to construction acllvity; Contractor to provide die <br />usual protection of existing improvements, nod exercise care and good sense <br />7• extended or after-hours use of the loading dock <br />29. In addition to cleaning raquiramenls described above. Comrnctur shall, in preparation for substantial completion or occupancy or the <br />prgleot by Tenant, perform final clearing ot'Commeto•'s Work. <br />30, Wiren Contractor takes over tin area from the Owner, before commencing Welk Contractor short Ascertain Thal the area is in a safe and <br />sunitAry condition, and maintain the uroa us necessary (lit its sole cost And expense) in a sole end snnlmry condition and to it standurd <br />meeting all applicable Imhs and regulutiuns, <br />31. Owner requiresjob progress meetings, Tile Contractor will attend with u representative mnhorized in .speak and act rat the Contractor's <br />behalf. Addilionnlly, ilia Contractor shall nodfy the Ownerorscheduled job progress meetings. <br />801 IV Chre Cmrinr C)r.. (y/i" njSnllla fiat rxaxd .j. <br />Exhibit U <br />