<br />15, Doors to all work areas, In ciudingstairwelIs and alechan] col and electrical closets, will remain closed at all time. Propping doers open is
<br />expressly prohibited.
<br />16. All Contractor and subcontractor personnel, materials, tools and equipment are to enter and exit the Building through the service elevator
<br />only. Owner may at any time initiate a check In/check out system, or a badge system, for all people and material In the Building and Ole
<br />Contractor will agree to cooperate with any such system.
<br />17, Before ordering material or doing work which is dependent upon proper size or installation, the Contractor shall field verify oil dimensions
<br />for accessibility with building conditions, and shall be responsible for same,
<br />IS. C6n tractor shall FuMpermitted any identifying sign age Or Advertis ins within the Project or But I ding.
<br />19. During conshvclion, Contractor shall maintain supervisory personnel on the site at all times. Such personnel shall be fully authorized to
<br />coordinate, respond for and authorize Contrnctor's work as necessary so as to enable all wodc to proceed in a timely and well -ordered
<br />fashion. Should Contractor perform work which would cause or require Owner to provide personnel to be present or otherwise perform
<br />any work, Contractor shall reimburse Owner for Ore expense of such personnel.
<br />20, Contractor shall be responsible for the protection of Its work and the area adjacent to his work.
<br />21. Contractor will ensure dual all stairwells, mechanical rooms, electrical and telephone closets, etc, accessed by Contractor or subcontractors
<br />In conjuncilon with Contractor's work, will be cleaned and f va of debris nightly.
<br />22, Public areas adjacent to premises where Contractor's work is being performed shall remain free afdebris and materials at all times,
<br />23. Contractor shall be responsible for all his actions on site as well as those of its subcontractors, and shall Indetnnlfy, defend and hold
<br />harmless the Owner end the other Owner Parties Hlem and against any and all claims, losses, or damages, threatened or Incurred, arising
<br />Item (lie actions or omisslons of Contractor or Its subcontractors,
<br />24. If keys are required by contractors, they must be checked out from tine Property Management office. No key will be distributed IPprape
<br />identification is not provided. r
<br />25. No cutting or patching of Owner's premises or installations, or those of any Building occupant, shall be permitted wlOmut the prior written
<br />consent of Owner, llequest far permission to do cutting shall include explicit details and description of work mid shall not under any
<br />cireullsmnoes diminish die structural integrityof Ore Building or die Integrity orally of components or systems. The work is to be done
<br />only with die explicit written permission of the property Manager, slid only on an "Off -Hours" basis, Such work is to be done only under
<br />the direct supervision of a competent member of the Contractor staff. Any such area is to be promptly repaired and returned to a fully
<br />t6netioning, complete, and clean condition,
<br />26, All work is to he done to a minimum standard of quality as required by the Base Building Drawings and Specifications (to be made
<br />available by Owner upon request), It is the responsibility or die Contractor to be fully knowledgeable of die Base Building Drawings and
<br />Specifications.
<br />27, All Life Safety Systems for the Building ere to be maintained, and all of ilia Tenant's Work is to be properly interfaced with and connected
<br />m the Base Building systems as required by Lows, or by Building operation. All work Is to be done In such n way as to protect all Base
<br />Building operations and wairamlinI, Any required disconnection critic safety devices should be "foreseen" and the Property Management
<br />Office must be notified at least 24 hours In advance, Costs do' false fire alarms due to contractors' or slibeantructors' negligence will be
<br />billed to and paid by the Contractor. All It fie -safety systems testing must be performed on all "alter -hours" basis and coordinated with the
<br />Building Manager.
<br />28, When Work is performed by Contractor or snbemurartor, charges will apply for additional services perfornied by Owner which may
<br />include, but pile not necessarily limited to the following:
<br />A - ovedime or after -tours elevator cause
<br />B - uOlily ussgc fbr construction activities beyond standard power and water used ill connection with geaerni office uses
<br />C. extra and continuous clean-up or elevators and public spaces as required due to emlialac ton activity; Contractor to pruvide die
<br />usual protection Of existing Improvements, and exercise Care and good sense
<br />D - extended or after-hours use of the loading dock
<br />29. In addition to cleaning requirements described above, Contractor shut,, in preparytion Itir substantial completion or occupancy critic
<br />project by Tenant, pelican final cleaning of Contractor's Work.
<br />30, When Contractor takes ever Ito toes thorn the Owner, before commencing work Contractor shall nscertahi ilia[ the oven is in o sore and
<br />sanitary condition, and maintain Ilia Inca as necessary (at its sole cost and e
<br />,,'acting all applicable Inws and regulations, xpensa) in a sale and sanitary condition and to o standard
<br />3L Owner requires ,lob progress meetings, The Cunh'uctor will attend with a representative authorized m speak mid Ile[ on the CnmrICLor s
<br />hehnif. Addirionally, ilia Contractor doll uoil'y tine Owner of schuduled job progress meetings.
<br />801 IYChil' Center f)r-CAP al',T nntebut Lease -E- Exhibit