EXHIBIT 3
<br />Within a reasonable time prior to (he start of oily on -site work, delivery of materials, equipment, or personnel, Contractor will submit to
<br />Owner the following;
<br />A- A complain set of drawings approved by Owner and subsequently by the City in which the Building is located.
<br />B- A fully executed Indemnity Agreement (To Be Provided by Owner Upon Request).
<br />C- Certificate orInsurance In a form approved by Owner executed by Insurance companies acceptable to Owner,
<br />D- A fully executed Notification -Rules for Contractors (To Be Provided by Owner Upon Requss0.
<br />E- A job schedule of the work to be accomplished, detailed by trade.
<br />F. A complete list of all proposed Subcontractors and suppliers. Owner must approve all contractors and subcontractors before
<br />commencement o f their work.
<br />0- The name end phone number (including emergency phone numbers) orpersonnel who are authorized to represent Ilia Contractor.
<br />3, No revisions or changes orally kind may be made to We construction plans previously approved by Owner without prior written consent of
<br />the Owner. Any proposed revisions or changes must be submitted to Owner in the form of a change order, for Owner's review, and
<br />approval prior to commencement of such changes. Revisions or changes altering the floor plan, base building systems, or builing
<br />operations must be submitted, In writing, to the Owner for review and approval prior to commencement of work.
<br />4. All of Contractor's work must be scheduled so that it in no way conflicts with, Interferes with, or Impedes lie quiet and peaceful enjoyment
<br />of odaer tenants or occupants of the project, or wid) the progress or Owner's work of operations. Any work that is in conftl et will be
<br />rescheduled by the Contractor to such time as approved by Owner. Additionally, Owner shalt hava no liability for any costs or expenses
<br />Incurred by Contractor (or Tenon() in connection with such rescheduling.
<br />S. Contractor and subconhrrc(os shall employ persons and nienns for the orderly progress of the work without interruption on account of
<br />strikes, work stoppages or simllat' causes of delay, Additionally, Owner shelf have no liability for any costs or expenses Incurred by
<br />Contractor (or Tenant) In connection with such delays.
<br />6. Materiels and tool storage will be limited to die areas for which access ties been granted.
<br />7. Clean-up and rubbish removal shall he provided by the Contractor at Contractor's expense. Contractor must, on a daily basis, remove all
<br />rubbish, surplus and waste material resulting from the performance of his work. At die request. or Owner, Contractor shall relocate any
<br />materials causing an obstruction as directed by Owner. Contractor will not be allowed to place a dumpstor on site on a continuous basis
<br />during construction.
<br />important note: The placement and location ofrubbish dumpsters and bins must be approved in advance by Owner.
<br />I. In general, Owner will Interface with Contractor to the extent necessary for work to be completed within Ole guidelines of project
<br />specifications and for the enforcement o f building rules and regulations.
<br />2. Contractor will make arrangements for unloading, brash removal and hoisting after name[ working hours due to the local city raise
<br />ordinance, (No such activity will be allowed between the boors of ID:00 p.m, to 7:00 inre,) At no time will tine Contractor be given
<br />exclusive reserved net of the freight elevator unless eppl led for by Contractor and approved by Owner. Contractor may be afforded access
<br />to loading dock space and hoisting facilities far limited use at such lime during normal working hours as Is prearranged wilh Owner, of nt
<br />other times, with the consent of Owner and upon payment of Owner's prevailing ree for after-hours use slid access.
<br />10. Cno actor will be afforded unloading areas as prearranged with Owner. All materials unloaded at dnese areas will be moved to an area of
<br />use Immediately and shalt not be stored or used in away which adversely impacts use of the Building.
<br />if. Contrnciar (and Tenon[) will be responsible fur the security of its own materiels, equipment and work, and that of his subcontractors,
<br />Contractor will also be responsible Rir damage caused by Contractor or its subcontractors to die project, Building and/or tenant areas,
<br />including. but not limited to the loading dock and indoor and outdoor public arms, freight elevators, etc. Any such damages will he
<br />promptly repaired to the Otwicr's satisfaction at sole coat of Contractor,
<br />12, Contractor will comply with all applicable codes, laws and regulations pol whi lit to the work ol'Conu umur, including all safety unit health
<br />regulations. The Contractor shall supply ilia Owner with a Master List of all iiazardous Materials and lieu• MWeriuI Salbty Do to Shoots
<br />(NISUS) upon delivery to the job site. A discussion will then ensue pertaining to the stile storage, handling Unit use ol'these materials, ns
<br />amll us the Contractor's emergency preparedness plmr fur handling the containment and clean -UP of potential I IMURRIotla Material spills.
<br />13. Contractor will nut engage In any labor practice that may delay or otherwise Impact the work of Owner or any other conunnctor.
<br />Id. No base building systems will be tuned oil' or disengaged by Contractor or any subcontractor without prior written approval and
<br />supervision by a representative arOwner or its agcul. Said systems Include but are not limbed to sprinklers, electrical circuits, air -bundling
<br />units, smoke heads and waler supply. Building electrical power shut -downs are allowed, with the prior written consent ol'Owner, on
<br />satunlays between 10;00 p,ul. and 3:00 a.m. only, A request for approval shall be made to [lie Pnipeoy M❑mager ill lent ten ( 10) days in
<br />advance.