EXHIBIT 3 <br />Within a reasonable time prior to (he start of oily on -site work, delivery of materials, equipment, or personnel, Contractor will submit to <br />Owner the following; <br />A- A complain set of drawings approved by Owner and subsequently by the City in which the Building is located. <br />B- A fully executed Indemnity Agreement (To Be Provided by Owner Upon Request). <br />C- Certificate orInsurance In a form approved by Owner executed by Insurance companies acceptable to Owner, <br />D- A fully executed Notification -Rules for Contractors (To Be Provided by Owner Upon Requss0. <br />E- A job schedule of the work to be accomplished, detailed by trade. <br />F. A complete list of all proposed Subcontractors and suppliers. Owner must approve all contractors and subcontractors before <br />commencement o f their work. <br />0- The name end phone number (including emergency phone numbers) orpersonnel who are authorized to represent Ilia Contractor. <br />3, No revisions or changes orally kind may be made to We construction plans previously approved by Owner without prior written consent of <br />the Owner. Any proposed revisions or changes must be submitted to Owner in the form of a change order, for Owner's review, and <br />approval prior to commencement of such changes. Revisions or changes altering the floor plan, base building systems, or builing <br />operations must be submitted, In writing, to the Owner for review and approval prior to commencement of work. <br />4. All of Contractor's work must be scheduled so that it in no way conflicts with, Interferes with, or Impedes lie quiet and peaceful enjoyment <br />of odaer tenants or occupants of the project, or wid) the progress or Owner's work of operations. Any work that is in conftl et will be <br />rescheduled by the Contractor to such time as approved by Owner. Additionally, Owner shalt hava no liability for any costs or expenses <br />Incurred by Contractor (or Tenon() in connection with such rescheduling. <br />S. Contractor and subconhrrc(os shall employ persons and nienns for the orderly progress of the work without interruption on account of <br />strikes, work stoppages or simllat' causes of delay, Additionally, Owner shelf have no liability for any costs or expenses Incurred by <br />Contractor (or Tenant) In connection with such delays. <br />6. Materiels and tool storage will be limited to die areas for which access ties been granted. <br />7. Clean-up and rubbish removal shall he provided by the Contractor at Contractor's expense. Contractor must, on a daily basis, remove all <br />rubbish, surplus and waste material resulting from the performance of his work. At die request. or Owner, Contractor shall relocate any <br />materials causing an obstruction as directed by Owner. Contractor will not be allowed to place a dumpstor on site on a continuous basis <br />during construction. <br />important note: The placement and location ofrubbish dumpsters and bins must be approved in advance by Owner. <br />I. In general, Owner will Interface with Contractor to the extent necessary for work to be completed within Ole guidelines of project <br />specifications and for the enforcement o f building rules and regulations. <br />2. Contractor will make arrangements for unloading, brash removal and hoisting after name[ working hours due to the local city raise <br />ordinance, (No such activity will be allowed between the boors of ID:00 p.m, to 7:00 inre,) At no time will tine Contractor be given <br />exclusive reserved net of the freight elevator unless eppl led for by Contractor and approved by Owner. Contractor may be afforded access <br />to loading dock space and hoisting facilities far limited use at such lime during normal working hours as Is prearranged wilh Owner, of nt <br />other times, with the consent of Owner and upon payment of Owner's prevailing ree for after-hours use slid access. <br />10. Cno actor will be afforded unloading areas as prearranged with Owner. All materials unloaded at dnese areas will be moved to an area of <br />use Immediately and shalt not be stored or used in away which adversely impacts use of the Building. <br />if. Contrnciar (and Tenon[) will be responsible fur the security of its own materiels, equipment and work, and that of his subcontractors, <br />Contractor will also be responsible Rir damage caused by Contractor or its subcontractors to die project, Building and/or tenant areas, <br />including. but not limited to the loading dock and indoor and outdoor public arms, freight elevators, etc. Any such damages will he <br />promptly repaired to the Otwicr's satisfaction at sole coat of Contractor, <br />12, Contractor will comply with all applicable codes, laws and regulations pol whi lit to the work ol'Conu umur, including all safety unit health <br />regulations. The Contractor shall supply ilia Owner with a Master List of all iiazardous Materials and lieu• MWeriuI Salbty Do to Shoots <br />(NISUS) upon delivery to the job site. A discussion will then ensue pertaining to the stile storage, handling Unit use ol'these materials, ns <br />amll us the Contractor's emergency preparedness plmr fur handling the containment and clean -UP of potential I IMURRIotla Material spills. <br />13. Contractor will nut engage In any labor practice that may delay or otherwise Impact the work of Owner or any other conunnctor. <br />Id. No base building systems will be tuned oil' or disengaged by Contractor or any subcontractor without prior written approval and <br />supervision by a representative arOwner or its agcul. Said systems Include but are not limbed to sprinklers, electrical circuits, air -bundling <br />units, smoke heads and waler supply. Building electrical power shut -downs are allowed, with the prior written consent ol'Owner, on <br />satunlays between 10;00 p,ul. and 3:00 a.m. only, A request for approval shall be made to [lie Pnipeoy M❑mager ill lent ten ( 10) days in <br />advance. <br />nor W Oklr Canny Ur—C10 n/.Snnrn:Inn Lama �4 Exhibil 1) <br />80A-692 <br />